外墙保温及节能材料外文翻译-材料科学(编辑修改稿)内容摘要:

ncrete and polystyrene board of bonding, the bination of good performance, high security. Single Wire Fabric benzene plate and concrete connections, rely mainly on the concrete and polystyrene board and the bonding Chacha reinforced, L, such as steel and concrete wall of the anchorage, with better performance. And double steel mesh, pared to onesided steel mesh technology with the cancellation of the inner steel mesh and installation of insulation board before the board lateral plastering, saving time and materials. Its cost can be reduced by 10 percent. However, the two approaches are used 济南大学毕业设计 外文资料 翻译 3 steel mesh planes, the higher cost, and the steel is hotconductor, direct heat will be reduced wall insulation effect. We are concrete and polystyrene board with a grid molding pound wall were studied. The experimental results show that, in concrete slurry of suitable conditions, the direct use of concrete as an adhesive to paste polystyrene board, it is entirely possible. When we polystyrene board on the back of treatment, with concrete bonding further improve (the average bond strength can be achieved Mpa, and damage occurred in polystyrene board). The technologysteel mesh canceled its performance of the insulation, and once again cut the cost of board. After its longterm durability demonstration, the project can be widely used. polystyrene insulation slurry particles external insulation Will be abandoned polystyrene plastic (for EPS) processing broken into the to 4 mm particle, as a lightweight aggregate to the preparation insulation mortar. The technology includes the insulation layer, the protective layer and cracking impermeability of protection layer (or layer of impermeable surface cracking of the mortar in 1). ZL powder particles of polystyrene insulation materials and technology in 1998 by the Ministry of Construction as on the national law. This method is now widely recognized wall insulation technology. The construction technique is simple and can reduce the labor intensity, and improving work efficiency。 difference in the quality of the structure from the impact of the wall on the defective construction of the wall need repair leveling, and the direct use of slurry Huabu insulation can avoid other Insulation Construction Technology for plastering leveling off Houer shedding phenomenon. At the same time the external wall insulation technology to solve the engineering harsh conditions resulting from the use of easy interface debonding hollowing, surface cracking, and other problems easier to achieve Exterior Insulation an important breakthrough technology. Insulation and other things, pared to the same insulating effect of the circumstances, its lower cost, lower housing construction costs. For example, with polystyrene insulation boards, pared to per square metre can reduce about 25 yuan. Fraunhofernew home in Tianjin highlevel external insulation is used in the works of such technology. Energysaving insulation materials are adiabatic materials. Insulation material is used for building envelope or thermal equipment, heat transfer impedance of the material or posite materials, including insulation materials, including insulation materials. The significance of thermal insulation material, on the one hand to meet the architectural space or thermal equipment thermal environment, on the other hand in order to save energy. With worldwide energy growing tensions in the energysaving aspects of thermal insulation 济南大学毕业设计 外文资料 翻译 4 material on the significance of significant outstanding. Residents generally only heating air conditioning, insulation enc。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。