塑料模具外文翻译-模具设计(编辑修改稿)内容摘要:

m, more than 50 progressive station, and the international life of the die 600 million times the highest average life of the die 50 million times pared to the mid 80s at the international advanced level. China39。 s plastic molding mold design, production technology started relatively late, the overall level of low. Currently a single cavity, a simple mold cavity 70%, and still dominant. A sophisticated multicavity mold plastic injection mold, plastic injection mold has been able to multicolor preliminary design and manufacturing. Mould is about 80 million times the average life span is about, the main difference is the large deformation of mold ponents, excess burr side of a large, poor surface quality, erosion and corrosion serious mold cavity, the mold cavity exhaust poor and vulnerable such as, injection mold 5um accuracy has reached below the highest life expectancy has exceeded 20 million times, the number has more than 100 chamber cavity, reaching the mid 80s to early 90s the international advanced level. mold Present Status of Technology Technical level of China39。 s mold industry currently uneven, with wide disparities. Generally speaking, with the developed industrial countries, Hong Kong and Taiwan xxx大学毕业设计(论文) 9 advanced level, there is a large gap. The use of CAD / CAM / CAE / CAPP and other technical design and manufacture molds, both wide application, or technical level, there is a big gap between both. In the application of CAD technology design molds, only about 10% of the mold used in the design of CAD, aside from drawing board still has a long way to go。 in the application of CAE design and analysis of mold calculation, it was just started, most of the game is still in trial stages and animation。 in the application of CAM technology manufacturing molds, first, the lack of advanced manufacturing equipment, and second, the existing process equipment (including the last 10 years the introduction of advanced equipment) or puter standard (IBM PC and patibles, HP workstations, etc.) different, or because of differences in bytes, processing speed differences, differences in resistance to electromagic interference, working is low, only about 5% of the mold manufacturing equipment of recent work in this task。 in the application process planning CAPP technology, basically a blank state, based on the need for a lot of standardization work。 in the mold mon technology, such as mold rapid prototyping technology, polishing, electroforming technologies, surface treatment technology aspects of CAD / CAM technology in China has just started. Computeraided technology, software development, is still at low level, the accumulation of knowledge and experience required. Most of our mold factory, mold processing equipment shop old, long in the length of civilian service, accuracy, low efficiency, still use the ordinary forging, turning, milling, planing, drilling, grinding and processing equipment, mold, heat treatment is still in use salt bath, boxtype furnace, operating with the experience of workers, poorly equipped, high energy consumption. Renewal of equipment is slow, technological innovation, technological progress is not much intensity. Although in recent years introduced many advanced mold processing equipment, but are too scattered, or not plete, only about 25% utilization, equipment, some of the advanced functions are not given full play. Lack of technology of highquality mold design, manufacturing technology and skilled workers, especially the lack of knowledge and breadth, knowledge structure, high levels xxx大学毕业设计(论文) 10 of pound talents. China39。 s mold industry and technical personnel, only 8% of employees 12%, and the technical personnel and skilled workers and lower the overall skill level. Before 1980, practitioners of technical personnel and skilled workers, the aging of knowledge, knowledge structure can not meet the current needs。 and staff employed after 80 years, expertise, experience lack of handson ability, not ease, do not want to learn technology. In recent years, the brain drain caused by personnel not only decrease the quantity and quality levels, and personnel structure of the emergence of new faults, lean, make mold design, manufacturing difficult to raise the technical level. mold industry supporting materials, standard parts of present condition Over the past 10 years, especially the Eighth FiveYear, the State organization of the ministries have repeatedly Material Research Institute, universities and steel enterprises, research and development of special series of die steel, molds and other moldspecific carbide special tools, auxiliary materials, and some promotion. However, due to the quality is not stable enough, the lack of the necessary test conditions and test data, specifications and varieties less, large molds and special mold steel and specifications are required for the gap. In the steel supply, settlement amount and sporadic users of massproduced steel supply and demand contradiction, yet to be effectively addressed. In addition, in recent years have foreign steel mold set up sales outlets in China, but poor channels, technical services support the weak and prices are high, foreign exchange settlement system and other factors, promote the use of much current. Mold supporting materials and special techniques in recent years despite the popularization and application, but failed to mature production technology, most still also in the exploratory stage tests, such as die coating technology, surface treatment technology mold, mold guide lubrication technology Die sensing technology and lubrication technology, mold to stress technology, mold and other antifatigue and anticorrosion technology productivity has not yet fully formed, towards xxx大学毕业设计(论文) 11 mer。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。