托福真题语法分册19958-20xx1doc145-经营管理(编辑修改稿)内容摘要:
tiated by physiological stimuli such as A B reproductive changes, external pressures such as weather changes, or a bination C of either types of changes. D 25. Lawrence Robert Klein received the 1980 Nobel Prize in economics for pioneering A B the useful of puters to forecast economic activity. C D 26. The strength, size, and surefootedness of the Hama make it as excellent beast of A B C burden in mountainous regions today as it was in the past. D 27. Nuclear energy, despite its early promise as a source of electrical power, is still A B C insignificant in pared with older and safer energy sources. D 28. Hawaii39。 s eight major islands and numerous islets form the only state in the United A B C States that is not lie on the mainland of North America. D 29. Established about 1300, the Aa pucblo in New Mexico is believed to be oldest A B C continuously occupied settlement in the United States. D 30. Nocturnal creatures, raccoons forage primarily at night and spend their days rest A B C D in their dens. 水妖的岛◎ T 之天堂 飞跃重洋托福版 8 31. Marian Anderson, in addition to gaining fame as a concert soloist, also served as a A B C United States delegates to the United Nations. D 32. Good dental hygiene and a proper diet are necessary for the maintain of sound teeth. A B C D 33. Rice adapt better than other grain crops to areas with unfavorable saline, alkaline, A B C or acid sulfate soils. D 34. Jeate Rankin, pacifist and lifetime crusader for social and electoral reform, was A B the first woman to be a membership of the United States Congress. C D 35. In the United States, Maryland ranks second only to Virginia as a oysterproducing state. A B C D 36. The social games of children help to prepare themselves for their adult roles. A B C D 37. Algae have been an extremely important link in the food chain after the beginning A B C of life on Earth as we know it. D 38. The chorus plays a large part in any oratorio, linking areas were sung by soloists A B C D with segments of choral music. 39. Butte, Montana, had built above large deposits of silver, gold, and copper and A B became known as the richest hill on Earth. C D 40. Realistic novels, in trying to present life as it actually is, have written many works A B C that are notable for their artistry of style. D 托福语法分册( ) 9 托福语法 1. Sociologists have long recognized that social tension _____. (A) elements from group living. (B) elements of a normal group life (C) living are a group of elements. (D) are normal elements of group life 2. _____ have a very keen sense of hearing, although most do not hear sounds audible to the human ear. (A) While some insects do (B) Some insects which (C) Some insects (D) That some insects. 3. Although both political parties wanted Dwight D. Eisenhower as their presidential nominee in 1952, he became a Republican candidate and _____. (A) President was electing (B) was elected President (C) to elect the President (D) being elected president. 4. If an act is rewarded many times, immediately and with strong reinforces, it will rapidly bee _____. (A) a habit (B) into a habit (C) that which a habit (D) a habit can be 5. Giant pandas resemble bears in shape and in _____. (A) it is a slow, clumsy way to walk (B) the slow, clumsy way they walk (C) they walk in a slow, clumsy way (D) their slow walk is clumsy. 6. _____ temperature at which air holds as much water vapor as it can is called the dew point. (A) It is the (B) Is the (C) As the (D) The 7. The earring is one of the oldest known ornaments and _____ pieces of stone, bone, or shell. (A) was from originally from 水妖的岛◎ T 之天堂 飞跃重洋托福版 10 (B) was made originally from (C) originally made was from (D) from originally made was 8. No one knows exactly _____. (A) how did speech begin (B) how speech began (C) how the beginning of speech (D) of how beginning speech. 9. _____ mechanical device has ever been invented that can satisfactorily replace teasel flower heads for raising the nap on cloth. (A) No (B) Not the (C) Never has a (D) There is no 10. Even as a girl, _____ to be her life, and theater audiences were to be her best teachers. (A) performances by Fanny Brice were (B) it was known that Fanny Brice39。 s performances were (C) audiences knew that Fanny Brice39。 s performances were (D) Fanny Brice knew that performing was 11. _____ the diffusion of heat upward to the Earth39。 s surface, the temperature within the Earth remains constant. (A) That (B) Despite (C) If (D) When 12. Noise in a room may be reduced by carpeting, draperies, and upholstered furniture, _____ absorb sound. (A) which they all (B) of them all (C) all of which (D) of all which 13. _____ devised to lessen the drudgery of washing clothes that origin of the washing machine is unclear. (A) Were the inventions so numerous. (B) The inventions so numerous. (C) So numerous were the inventions. (D) The inventions that were so numerous. 14. Of the thousands of varieties of bird species in North America, _____ bright red plumage, like the cardinal, are most often designated as state bird. (A) those that have (B) who have (C) which have (D) to have their 15. _____ as a territory in 1854 and admitted as a state in 1861, Kansas is at the geographical center of。托福真题语法分册19958-20xx1doc145-经营管理(编辑修改稿)
相关推荐
6 验证的过程包括 A 提出验证项目、制定验证方案、组织实施、写验证报告 B 提出验证项目、起草验证方案、审批验证方案、组织实施 C起草验证方案、审批验证方案、组织实施 D起草验证方案、讨论验证方案、修改验证方案、组织实施 E起草验证方案、审批验证方案、组织实施、写验证报告 17 负责对物料取样、检验、留样的部门是 A 供应管理部门 B 销售管理部门 C 质量管理部门 D 技术管理部门 E
育基金成为家庭理财的一项重要内容。 像住房、买车等大宗消费一样,绝大多数家庭都面临着这样一个问题 —— 尽早为孩子设立教育专项基金。 10 深情推荐:鸿宇两全 • 专门针对少儿教育、养老的需要,为子女提供大学教育金、子女婚嫁金、养老金保障。 凡出生30天以上至17周岁以下,身体健康者均可作为被保险人。 家长关爱子女的最好选择 ,为子女的成长 ,教育提供最完美的和最人性化的保障 . •
、无菌蒸馏水的处方属于 第 69题 受碱性尿的影响,排泄速度显著下降的是 第 70题 不宜与碱性药物配伍的是 第 71题 不宜与酸性药物配伍的是 第 72题 影响地高辛排泄导致中毒的是 X型题: 第 73题 改善难溶性药物的溶出速度的方法有 第 74题 可以避免肝脏首过效应的片剂是 第 75题 微晶纤维素可用作 第 76题 对皮肤具有渗透促进作用的是 第 77题 以下不能添加抑菌剂的是 第
营养偏离) 化验检查 通过血液检查了解营养状况 血色素 微量元素 蛋白质 胆固醇 脂肪 维生素 碱性磷酸酶 四、儿童常见营养性疾病 如果膳食调配营养不当,也会造成营养性疾病 营养缺乏性疾病 营养不良:由于热量或蛋白质供给不足引起 维生素 D缺乏性佝偻病:体内缺乏维生素 D引起钙吸收差,造成骨骼发育不良。 缺铁性贫血:膳食中铁不足或膳食搭配不合理 维生素缺乏
员都要成为我们未来销售的核心) 2020/9/19 2020/9/19 渠道特训营的两种模式 集中式: 一般时间为 57天,每日早、夕会同时运作,每天都做高密度追踪 延长式: 一般时间为 2030天,分阶段运作,定期总结、培训 2020/9/19 渠道特训营的前期沟通 用精美的 策划案 、专业的形象征服银行方领导 操作要点:双方取得高度认同,力度不大不举办 活动策划、运作到位,做好各种情况的预判
式 C型管理模式:技术型专业管理模式-骏马式 D型管理模式:市场型权变管理模式-狐狸式 E型管理模式:团队型自主管理模式-群雁式 F型管理模式:文化型柔性管理模式-海豚式 G管理模式: 标准型场变管理模式-巨龙式 管理模式 =理念 +系统 +方法=人+制度+创新 G=f( e, p, k, c ) 七种典型管理模式 理念系统 Idea 运营系统 Operation 策略系统 Stratagem