土木工程毕业设计外文资料翻译--简支梁布局-建筑结构(编辑修改稿)内容摘要:
beams, Fig. straight cables are preferred, since they can be more easily tensioned between two abutments. Let us start with a straight cable in a straight beam of uniform section, (a).This is simple as far as form and workmanship are concened, But such a section cannot often be economically designed, because of the conflicting requirements of the midspan and end sections. At the maximum moment section generally occurring at midspan, it is best to place the cable as near the bottom as possible in order to provide the maximum lever arm for the internal resisting moment. When the MG at midspan is appreciable, it is possible to place the c. g. s. much below the kern without producing tension in the top fibers at transfer. The end section, however, presents an entirely different set of requirements. Since there is no external moment at the end, it is best to arrange the tendons so that the c. g. s. will coincide with the c. g. c. at the end section, so as to obtain a uniform stress distribution. In any case, it is necessary to place the c. g. s. within the kern if tensile stresses are not permitted at the ends, and not too far outside the kern to avoid tension stress in excess of allowable values. It is not possible to meet the conflicting requirements of both the midspan and the end sections by a layout such as ( a ). For example, if the c. g. s. is located all along the lower kern point, which is the lowest point permitted by the end section, a satisfactory lever arm is not yet attained for the internal resisting moment at midspan. If the c. g. s. is located below the kern, a bigger lever arm is obtained for resisting the moment at midspan, but stress distribution will be more unfavorable at the ends. Besides, too much camber may result from such a layout, since the entire length of the beam is subjected to negative bending due to prestress. In spite of these objections, this simple arrangement is often used, especially for short spans. Fig 87. Layouts for pretensioned beams. For a uniform concrete section and a straight cable, it is possible to get a more desirable layout than ( a ) by simple varying the soffit of the beam, as in Fig. 87( b ) and ( c )。 ( b ) has a bent soffit, while ( c ) has a curved one. For both layouts, the c. g. s. at midspan can be depressed as low as desired, while that at the ends can be kept near the c. g. c. If the soffit can be varied at will, it is possible to obtain a curvature that will best fit the given loading condition。 for example, a parabolic soffit will suit a uniform loading. While these two layouts are efficient in resisting moment and favorable in stress distribution, they possess three disadvantages. First, the formwork is more plicated than in ( a ). Second, the curved or bent soffit is often impractical in a structure, for architectural or functional reasons. Third, they cannot be easily produced on a longline pretensioning bed. When it is possible to vary the extrados of concrete, a layout like Fig. 87( d ) or ( e ) can be advantageously employed. These will give a favorable height at midspan, where it is most needed, and yet yield a concentric or nearly concentric prestress at end section. Since the depth is reduced for the end sections, they must be chec。土木工程毕业设计外文资料翻译--简支梁布局-建筑结构(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。