土木工程毕业设计外文翻译--拱桥的设计和桥梁裂缝产生的原因分析-桥梁设计(编辑修改稿)内容摘要:
r several kinds of main reasons produced. The kind of the concrete bridge crack, on its reason to produce, can roughly divide several kinds as follows : First, load the crack caused Concrete in routine quiet. Is it load to move and crack that produce claim to load the crack under the times of stress bridge, summing up has direct stress cracks, two kinds stress crack onces mainly. Direct stress crack refer to outside load direct crack that stress produce that cause. The reason why the crack produces is as follows: (1) Design the stage of calculating, does not calculate or leaks and calculates partly while calculating in structure。 Calculate the model is unreasonable。 The structure is supposed and accorded with by strength actually by strength。 Load and calculate or leak and calculate few。 Internal force and matching the mistake in putation of muscle。 Safety coefficient of structure is not enough. Do not consider the possibility that construct at the time of the structural design。 It is insufficient to design the section。 It is simply little and 本 科毕业设计 英文文献 7 assigning the mistake for reinforcing bar to set up。 Structure rigidity is insufficient。 Construct and deal with improperly。 The design drawing can not be explained clearly etc. (2) Construction stage, does not pile up and construct the machines, material limiting。 Is it prefabricate structure structure receive strength characteristic, stand up, is it hang, transport, install to get up at will to understand。 Construct not according to the design drawing, alter the construction order of the structure without authorization, change the structure and receive the strength mode。 Do not do the tired intensity checking putations under machine vibration and wait to the structure. (3) Using stage, the heavyduty vehicle which goes beyond the design load passes the bridge。 Receive the contact, striking of the vehicle, shipping。 Strong wind, heavy snow, earthquake happen, explode etc. Stress crack once means the stress of secondary caused by loading outside produces the crack. The reason why the crack produces is as follows, (1)In design outside load function, because actual working state and routine, structure of thing calculate have discrepancy or is it consider to calculate, thus cause stress once to cause the structure to fracture in some position. Two is it join bridge arch foot is it is it assign X shape reinforcing bar, cut down this place way, section of size design and cut with scissors at the same time to adopt often to design to cut with scissors, theory calculate place this can store curved square in, but reality should is it can resist curved still to cut with scissors, so that present the crack and cause the reinforcing bar corrosion. (2)Bridge structure is it dig trough, turn on hole, set up ox leg, etc. to need often, difficult to use a accurate one diagrammatic to is it is it calculate to imitate to go on in calculating in routine, set up and receive the strength reinforcing bar in general foundation experience. Studies have shown, after being dug the hole by the strength ponent, it will produce the diffraction phenomenon that strength flows, intensive near the hole in a utensil, produced the enormous stress to concentrate. In long to step prestressing force of the continuous roof beam, often block the steel bunch according to the needs of section internal force in stepping, set up the anchor head, but can often see the crack in the anchor firm section adjacent place. So, if deal with improper, in corner of ponent form sudden change office, block place to be easy to appear crack strength reinforcing bar of the structure. In the actual project, stress crack once produced the most mon reason which loads the crack. Stress crack once belong to one more piece of nature of drawing, splitting off, shearing. Stress crack once is loaded and caused, only seldom calculate according to the routine too, but with 本 科毕业设计 英文文献 8 modern to calculate constant perfection of means, times of stress crack to can acplish reasonable checking putations too. For example to such stresses 2 times of producing as prestressing force, creeping, etc. , department39。 s finite element procedure calculates levels pole correctly now, but more difficult 40 years ago. In the design, should pay attention to avoiding structure sudden change (or section sudden change), when it is unable to avoid, should do part deal with, corner for instance, make round horn, sudden change office make into the gradation zone transition, is it is it mix muscle to construct to strengthen at the same time, corner mix again oblique to reinforcing bar, as to large hole in a utensil can set up protecting in the perimeter at the terms of having angle steel. Load the crack characteristic in accordance with loading differently and presenting different characteristics differently. The crack appears person who draw more, the cutting area or the serious position of vibration. Must point out, is it get up cover or have along keep into short crack of direction to appear person who press, often the structure reaches the sign of bearing the weight of strength limit, it is an omen that the structure is destroyed, its reason is often that sectional size is partial and small. Receive the strength way differently according to the structure, the crack characteristic produced is as follows: (1) Central tension. The crack runs through the ponent cross section, the interval is equal on the whole, and is perpendicular to receiving the strength direction. While adopting the whorl reinforcing bar, lie in the secondclass crack near the reinforcing bar between the cracks. (2)The centre is pressed. It is parallel on the short and dense parallel。土木工程毕业设计外文翻译--拱桥的设计和桥梁裂缝产生的原因分析-桥梁设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。