土木工程毕业设计外文翻译---建筑结构整体设计-建筑创作和综合技术-建筑结构(编辑修改稿)内容摘要:
a munication apparatus , exchange equipment and other administrative systems link to each other, make the equipment and outside munication work link to each other too. It include external telemunication connection piece and inside information speech all cable and relevant wiring position of data terminal of workspace of work. The prehensive wiring system adopts the products of American ATamp。 T Corp.. Connected up the subsystem among the subsystem , management subsystem , arterial subsystem and equipment to make up by workspace subsystem , level. (2) Automated systems of security personnel The monitoring systems of security personnel of the building divide into the public place and control and control two pieces of system equipment with the national treasury specialpurposly synthetically. The specialpurpose monitoring systems of security personnel of national treasury are in the national treasury , manage the storehouse on behalf of another , transporting the paper money garage to control strictly, the track record that personnel e in and go out, have and shake the warning sensor to every wall of national treasury , the camera, infrared microwave detector in every relevant rooms, set up the automation of controlling to control. In order to realize building intellectuality, the architect has finished plete indoor environment design, has created the fortable , highefficient working environment , having opened up the room internal and external recreation space not of uniform size, namely the green one hits the front yard and roofing, have offered the world had a rest and regulated to people working before automation is equipped all day , hang a design adopt the special building to construct the node in concrete ground , wall at the same time. 2, has not glued and formed the flat roof beam of prestressing force dull and stereotyped structure technology and flat roof beam structure technology In order to meet the requirement with high assurance that the architect puts forward , try to reduce the height of structure ponent in structure speciality, did not glue and form the flat roof beam of prestressing force concrete dull and stereotyped structure technology and flat roof beam structure technology after adopting. (1) Adopt prestressing force concrete roof beam board structure save than ordinary roof beam board concrete consumption 15%, steel consumption saves 27%, the roof beam reduces 300mm high. (2) Adopt flat roof beam structure save concrete about 10% consumption than ordinary roof beam board, steel consumption saves %, the roof beam reduces 200mm high. Under building total situation that height does not change , adopt abovementioned structure can make the whole building increase floor area of a layer , have good economic benefits and social benefit. 3, the temperature of the baseplate matches muscle technology In basement design , is it is it is it after calculating , take the perimeter to keep the construction technology measure warm to split to resist to go on to baseplate, arrange temperature stress reinforcing bar the middle cancelling , dispose 2 row receives the strength reinforcing bar up and down only, this has not only save the fabrication cost of the project but also met the basement baseplate impervious and resisting the requirement that splits. 4, the foundation of the basement encloses and protects the new technology of design and operation Adopt two technological measures in enclosing and protecting a design: (1) Cantilever is it is it hole strength is it adopt form strengthen and mix muscle technology to design to protect to enclose, save the steel and invite 60t, it invests about 280,000 to save. (2) Is it is it protect of of elevation and keep roof beam technology to enclose , is it protect long to reduce to enclose all to reduce, keep roof beam mark level on natural ground , is it is it protect of lateral pressure receive strength some height to enclose to change, saving cubic meters of concrete, steel , reduces and invests 304,000 yuan directly through calculating. 5, ice hold cold air conditioner technology Ice hold cold air conditioner technology belong to new technology still in our country , it heavy advantage that the electricity moves the peak and operates the expenses sparingly most. In design, is it ice mode adopt some (weight ) hold mode of icing , is it ice refrigeration to be plane utilization ratio high to hold partly to hold, hold cold capacity little。土木工程毕业设计外文翻译---建筑结构整体设计-建筑创作和综合技术-建筑结构(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。