土木工程外文翻译--预应力混凝土结构的抗震加固方案与局部影响-建筑结构(编辑修改稿)内容摘要:
vel of intervention is a rather plex procedure, because many factors of different nature e into play. A decision has to be taken on the level of intervention. Some mon strategies are the restriction or change of use of the building, partial demolition and/or mass addition, methods such as base isolation, provision of supplemental damping and incorporation of passive and active vibration control devices may apply. The alternatives of ‘no intervention’ or ‘demolition’ are more likely the outes of the evaluation if the seismic retrofit of buildings is quite expensive and disruptive. Socioeconomic issues have to be considered in the decision of the level and type of intervention. Surprisingly, there are documented cases where aesthetic and psychological issues dictate the rehabilitation strategies. For example, in the Mexico City earthquake of 19 September 1985, where external bracing was popular, because it instilled a feeling of confidence in the occupants that significant and visible changes have been made to the structure to make it safer. Cost vs importance of the structure is a significant factor, especially in the case that the building is of cultural and/or historical interest. The available workmanship and the level of quality control define the feasibility of the proposed intervention approach. The duration of work/disruption of use and the disruption to occupants should also be considered. The functionality and aesthetical patibility of the intervention scheme with the existing building is an additional engagement. Even the reversibility of the scheme in case it is not accepted on a longterm basis should be taken into account. From a technical point of view the selection of the type and level of intervention have to be based on pat。土木工程外文翻译--预应力混凝土结构的抗震加固方案与局部影响-建筑结构(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。