新版成本估价单2(表格模板)内容摘要:
新版成本估价单2(表格模板) 成本估价单产品编号 年 月 日产品名称规格 最低订量A、制造成本 B、营业成本项 目 原材料名称规格 单位 数量 单价 金 ( 元 ) 额 项 目 分摊率 金 ( 元 ) 额(1)原料 (9)销管费用(10)财务费用总 成 本 (8)+(9)+(10)每打成本报 价利 益(2)物料 利 益 率销&&)包 装 用 料(4)直 接 工 资 工 时工 时工 时(5)损 耗(6)合 计 (1)+(2)+(3)+(4)+(5)(7)制 造 费 用(8)总 计 制造成本(6)+(7) NT。新版成本估价单2(表格模板)
相关推荐
ry, building the economy , And III other disciplines and construction technology, construction and other fields of knowledge, as well as puter and mechanical testing techniques. Civil engineering is
ce in temperature variety more big, perhaps is a concrete to be subjected to assault of cold wave etc., will cause concrete surface the temperature sharply descend, but creation constringency,
material and labor consumption in the construction course to reduce the cost and control all the consumptions influencing the cost within the planned scope. Therefore, a construction enterprise must
aejuk island with a width of 1800 m and a depth of 18 m. For this navigation channel no height restriction is accepted by the Authorities and as such a tunnel has been the obvious way to cross. For
cture reinforcement transformation necessary use39。 s technology 1) The request trades the technology It is the joist (either truss) opens the column (or wall), the joist terminal and the joist
nd access openings between the adjacent partments (doors and stairs). Fire spread via the external openings (windows) is a distinct possibility given a fully developed fire. Limit ing the window