土木工程外文文献翻译-建筑结构(编辑修改稿)内容摘要:
of moisture at temperatures above 50176。 F. It is necessary to maintain such a condition in order that the chemical hydration reaction can take place. If drying is too rapid, surface cracking takes place. This would result in reduction of concrete strength due to cracking as well as the failure to attain full chemical hydration. It is clear that a large number of parameters have to be dealt with in proportioning a reinforced concrete element, such as geometrical width, depth, area of reinforcement, steel strain, concrete strain, steel stress, and so on. Consequently, trial and adjustment is necessary in the choice of concrete sections, with assumptions based on conditions at site, availability of the constituent materials, particular demands of the owners, architectural and headroom requirements, the applicable codes, and environmental reinforced concrete is often a siteconstructed posite, in contrast to the standard millfabricated beam and column sections in steel structures. A trial section has to be chosen for each critical location in a structural system. The trial section has to be analyzed to determine if its nominal resisting strength is adequate to carry the applied factored load. Since more than one trial is often necessary to arrive at the required section, the first design input step generates into a series of trialandadjustment analyses. The trialand –adjustment procedures for the choice of a concrete section lead to the convergence of analysis and design. Hence every design is an analysis once a trial section is chosen. The availability of handbooks, charts, and personal puters and programs supports this approach as a more efficient, pact, and speedy instructional method pared with the traditional approach of treating the analysis of reinforced concrete separately from pure design. Earthwork Because earthmoving methods and costs change more quickly than those in any other branch of civil engineering, this is a field where there are real opportunities for the enthusiast. In 1935 most of the methods now in use for carrying and excavating earth with rubbertyred equipment did not exist. Most earth was moved by narrow rail track, now relatively rare, and the main methods of excavation, with face shovel, backacter, or dragline or grab, though they are still widely used are only a few of the many current methods. To keep his knowledge of earthmoving equipment up to date an engineer must therefore spend tine studying modern machines. Generally the only reliable uptodate 唐 山 学 院 毕 业 设 计 8 information on excavators, loaders and transport is obtainable from the makers. Earthworks or earthmoving means cutting into ground where its surface is too high ( cuts ), and dumping the earth in other places where the surface is too low ( fills). Toreduce earthwork costs, the volume of the fills should be equal to the volume of the cuts and wherever possible the cuts should be placednear to fills of equal volume so as to reduce transport and double handlingof the fill. This work of earthwork design falls on the engineer who lays out the road since it is the layout of the earthwork more than anything else which decides its cheapness. From the available maps ahd levels, the engineering must try to reach as many decisions as possible in the drawing office by drawing cross sections of the earthwork. On the site when further information bees available he can make changes in jis sections and layout,but the drawing lffice work will not have been lost. It will have helped him to reach the best solution in the shortest time. The cheapest way of moving earth is to take it directly out of the cut and drop it as fill with the same machine. This is not always possible, but when it canbe done it is ideal, being both quick and cheap. Draglines, bulldozers and face shovels an do this. The largest radius is obtained with the dragline,and the largest to。土木工程外文文献翻译-建筑结构(编辑修改稿)
相关推荐
dicators(independent experts engineers experienced in dispute resolution) will provide a binding first instance decision on all eventual disputes that might occur between Contractor and Employer
deeply ( but only below themselves ) to a fairly flat surface, carry it hundreds of meters if need be, then drop it and level it roughly during the dumping. For hard digging it is often found
her countries. The activity concentration of 226Ra and 232Th for all measured samples of Portland cement are parable with the corresponding values of other countries. The obtained results show that
can be obtained by dividing the stress values by the modulus of elasticity of concrete at t0, Ec(t0). Step 2: Free creep and shrinkage of concrete. The distribution of hypothetical free change in
use of t he hori2 zontal force t ransferred by bigger beam bar . But force is small . 3. 3. 2 load2displacement curves analysis Fig. 9 shows t he typical load2displacement curves at t he beam end of
d reinforcing bar ) with ribbing of Ф 18 50mm, connection between the same diameter or different diameters reinforcing bar . must squeeze link Extruders used in the covers, reinforced axis along the