土木工程专业毕业设计外文翻译--钢筋混凝土结构中钢筋连接综述-建筑结构(编辑修改稿)内容摘要:

d reinforcing bar ) with ribbing of Ф 18 50mm, connection between the same diameter or different diameters reinforcing bar . must squeeze link Extruders used in the covers, reinforced axis along the cold metal sleeve squeeze dedicated to insert sleeve Lane two hot rolling steel drums into a highly integrated mechanical linking methods. Characteristic: Easy to operate and joining fast and not having flame homework , can construct for 24 hours , save a large number of reinforcing bars and energy. Applicable scope : Suitable for , set up according to first and second class antidetonation requirement proof armored concrete structure ФⅡ , Ⅲ grade reinforcing bar with ribbing of hot rolling of 20 32mm join and construct live. cone thread connecting Using cone thread to bear pulled, pressed both effort and selflocking nature, undergo good principles will be reinforced by linking into coneprocessing thread at the moment the value of integration into the joints connecting steel bars. Characteristic。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。