土木外文翻译--建筑土木结构与砌体结构-建筑结构(编辑修改稿)内容摘要:

f the papers have been selected for the special following a short presetation of the proposed papers is given. C. A. Anagnostopoulos ,A. C. Anagnostopoulos:the usual problems encountered during restoration of a historical masonry with strong adhesion mortars, are the irreversibility of the method,the inpatibility between the old and new mortar and the lowering of the masonry porosity,resulting in the increase of humidity .For these reasons,mortars with controlled strength and porosity have been designed and studied, in order to be used in restoration of ancient masonries. C. Modena,M. R. Valluzzi,R. Tongini Folli, :A presentation is given of the fundamental design choices and of the selection of the most appropriate materials and techniques for which have been made for strengthening the Monza Cathedral BellTower,based on investigation and structural assessment carried out prior to and during the design process. The results of the experimental and numerical investigation are previously given in order to explain the reasons for the design choice. ,:one of the concerns with the conventional metal anchors that are used to tie the brick veneer to the backup portion of enclosure walls ( block) is the potential for corrosion. Corrosion reduces the loadcarrying capacity of such ties and this could lead to brittle failure especially in the event of an earthquake. In this paper ,the force in lateral ties in a typical brick veneer wall system are evaluated when the building is subjected to some earthquake records. Distribution of tie forces resulting from the dynamic analysis of a finite element model of。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。