新版出差申请单(二)(表格模板)内容摘要:
新版出差申请单(二)(表格模板) 出差申请单(二)出差人姓名 服务部门 职称 职务代理人 事由 日期 自年月日时起至年月日时止计天地点 预支旅费 万仟佰拾元整备注经理:人事:主管:出差人:注:第一联出差人作旅费报销用,第二联请送人事科,第三联凭向出纳科预支旅费。新版出差申请单(二)(表格模板)
相关推荐
this suggests that creative integration of structural (and mechanical and electrical) design with the total architectural design concept can result in either a reduction in purely construction design
ement, such as geometrical width, depth, area of reinforcement, steel strain, concrete strain, steel stress, and so on. Consequently, trial and adjustment is necessary in the choice of concrete
according to the data observed at the scene and provide a suitable boundary value based on the position of the permafrost base and the geothermal gradient of the thaw rock materials beneath the
points C, D and E are based on Table from [6] for △y was taken as rad per Note 3 in [6], Table . Shear hinge load load–deformation model points C, D and E are based on Table [6], Link Beam, Item a. A
was taken as rad per Note 3 in [6], Table . Shear hinge load load–deformation model points C, D and E are based on Table [6], Link Beam, Item a. A strain hardening slope between points B and C of 3%
requires the construction units should have a strong excavation, transport and slag out and 河南理工大学本科毕业设计(论文) 外文文献及译文 6 support capability, Maojingba VI : Class V rock used in the fullface excavation