土木专业毕业设计外文翻译--沥青路面-建筑结构(编辑修改稿)内容摘要:

oil amount. The onthespot construction technological requirement is replied and pigeonholes the temperature after finishing to control above 130 degrees, press and adopt the large tonnage tire road roller for the first time (pressure of tires is more than of Mpas). The kind of the pitch and ore material glue the strength of forming influencing the pitch concrete to the seizing of the pitch directly in addition, so the good modified pitch with good resisting splitting at the time of the low temperature at the same time of hightemperature stability has appeared at home, and should deal with the acid and neutral hard quality ore material , improve the seizing, generally adopt and catch the lime wash and is washed or mixed and adds the quick lime powder or low grade cement. 2 Pitch preventative maintenance and machinery of concrete road surface The characteristic of concrete road surface of original sin and type of damaging Pitch because concrete road surface use and glue and form strength better pitch material made and bine the material , therefore gluing the strength of forming while strengthening the ore material greatly , has improved the intensity and stability of the mixture, make to use the quality and durability raise road surface . Pitch concrete road surface have surface level, infiltrate, drive a vehicle advantage fortable, with low noises, therefore find more and more extensive application. But it is often influenced by respects, such as weather, temperature, driving a vehicle and ma terial, and such reasons of the respect as the road surface structure is designed, will present various disease unavoidably, and the disease has brought harmful influence on driving speed, road surface service life, passenger39。 s fortableness and traffic safety. Pitch damage of concrete road surface overall to can be divided into two big classes, one is structural damage , including the destruction of a certain part whole or among them of structure of road surface , the ones that made road surface unable to support and is scheduled loaded。 Another functional damage, it might follow and structural damage take place, but because roughness and resisting the decline in slippery performance,etc. make it not have a function booked again, thus influenced quality of driving a vehicle. Pitch early disease of concrete road surface show as early rut and decay of roughness, suffused with oil and resist slippery decline of performance often at expressway, show as early small crack at ordinary arterial highway, detailed material lose cause undisguised, polishes, , the host is lost, surface disease that the road surface infiltrates. That the pitch wears out. If disease the can deal with but develop as one pleases in early days, must lead to the fact surface to be loose further, or cause serious deformation disease, such as peeling off and rut of depth of lower floor. Because of infiltrating, then cause structural damage, such as whole trough, thus must adopt the repairing method to carry on road surface maintenance. So seek one swift helping, cost rational settlement pitch concrete road surface early applicable technology of disease to maintain to be solved problem urgently in the work Important meaning of preventative maintenance Around the relation that is built and maintaining, maintaining and preventing, with the constant perfection of the road work, only keep good road surface serviceability for a long time, the huge investment of road construction could give full play to its investment benefit , keep road surface good technological state must have one maintaining and support system e guarantee powerful for a long time, e from this meaning and say , maintain a kind of continuation that is road construction in fact. In the road surface maintains the relation with maintenance, People always get used to it after the road surface begins to be damaged for a long time , just remembers that will carry on maintenance to it, Carry on preventative meaning of maintenance know enough often under being also in good state to road surface. Preventative maintenance is a kind of periodic pressure maintenance measure in fact, it does not consider whether there is a certain damage on the road surface, Preventative maintenance best to implement opportunity should to in good state s till in road surface, or go on only at the time of some disease omen . Though preventative maintenance needs to invest some expenses, it is a kind of expenses benefit than very good maintenance measure. American department mentions in the road surface solution , what the American road industry was once passed to different grades of hundreds of thousands kilometers is followed, find that the serviceability and lifespan of these roads have a mon change characteristic : A road with qualified quality, performance drops by 40% within service life 75%, called preventative maintenance stage this stage. Such as be unable to in time maintenance, in 12% service life in the time, performance drops by 40% again afterwards, cause and maintain cost increase by a large margin , call that and correct maintenance stage this stages. Count and draw and invest through investigation 1 preventative maintenance fund can economize 3 l0 yuan correct maintenance conclusion of fund each time. . SHRP plan one important achievement point out preventative maintenance delay road surface serviceability worsen the speed, lengthen its service life and economize the important meaning of expenses of life cycle. Correct serviceability that implement preventative maintenance and can keep the road surface good , lengthen life cycle of road surface , reduce life cycle expenses and economize and maintain the fund. Plan and estimate according to SHRP , go on preventative maintenance of 34 can lengthen 10 1 years such as service life wit。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。