土建毕业设计外文翻译---一个未完工的二层预制混凝土结构物的抗震测试-建筑结构(编辑修改稿)内容摘要:

discussed in the paper It is of interest to note that results of the type shown in Fig. 2 have been also found by Bertero39。 in shake table tests of a dual system. DESCRIPTION OF TEST STRUCTURE The test structure used in this investigation is a twostory precast concrete building, representative of a lowrise parking structure located in the highest seismic zone of Mexico City. The prototype was constructed at onehalf scale. For the sake of simplicity, ramps required in a parking structure have not been considered in the selected prototype structure. Their use, requiring large openings in the floor system, would have required a very plex model of the floor system for both linear and nonlinear analysis of the structure. A detailed description of the dimensions, materials, design procedures, and construction of the test structure can be found A summary of this information is given below. The dimensions and some characteristics of the test structure are shown in Fig. 3. The longitudinal and transverse are shown in Fig3a. Also, the exterior (longitudinal) frame containing the wall (Column Lines 1 and 3) are termed the lateral frame (see Fig, 3b), and the internal (longitudinal) frame with the single tee (Column Line 2) are termed the central frame. Doable tees spanning in the longitudinal direction are supported by Lshaped precast beams in the transverse direction as shown in Fig3a. The structure uses precast frames and precast structural walls, the latter elements functioning as the main lateral load resisting system. Fig. 4 shows an early phase of the construction of the test structure. As can be seen, the windows39。 39。 in the columns and walls are left in these elements for a later assemblage with the precast beams. The unfastened design base shear required by the Mexico City Building Code (MCBC, 1993)2 is , where WT is the total weight of the prototype structure, assuming a dead load of 5,15 KPa (108 psi) and a live load of KPa ( psi). The prototype structure was designed using procedures of elastic analyses and proportioning requirements of the MCBC, In these analyses, the gross moment of inertia of the members in the structure was considered and rigid offsets (distances from the joints to the face of the supports) were assumed for all beams in the structure except for beams in the central frame, which had substandard detailing as will be described latch. Results from these analyses indicated that the structural walls in the test structure would take about 65 percent of the design lateral loads. A review of the nominal lateral resistance of the structure using the MCBC procedures showed that this resisting force was about times the required code lateral resistance (0,2Wr), This is one of several factors, later discussed, that contributed to the overstrength of the structure. The longitudinal reinforcement in all the structural elements of the test structore was deformed bars from Grade 420 steel. Table 1 lists the concrete pressive cylinder strengths for different members of the prototype structure. Fig. 5 shows。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。