土建专业毕业设计外文翻译--抗侧向荷载的结构体系(编辑修改稿)内容摘要:
dings perhaps 40stories and higher. However, except for possible aesthetic considerations, belt trusses interfere with nearly every building function associated with the outside wall。 the trusses are placed often at mechanical floors, mush to the disapproval of the designers of the mechanical systems. Nevertheless, as a costeffective structural system, the belt truss works well and will likely find continued approval from designers. Numerous studies have sought to optimize the location of these trusses, with the optimum location very dependent on the number of trusses provided. Experience would indicate, however, that the location of these trusses is provided by the optimization of mechanical systems and by aesthetic considerations, as the economics of the structural system is not highly sensitive to belt truss location. TubeinTube Structures The tubular framing system mobilizes every column in the exterior wall in resisting overturning and shearing forces. The term‘ tubeintube’ is largely selfexplanatory in that a second ring of columns, the ring surrounding the central service core of the building, is used as an inner framed or braced tube. The purpose of the second tube is to increase resistance to over turning and to increase lateral stiffness. The tubes need not be of the same character。 that is, one tube could be framed, while the other could be braced. In considering this system, is important to understand clearly the difference between the shear and the flexural ponents of deflection, the terms being taken from beam analogy. In a framed tube, the shear ponent of deflection is associated with the bending deformation of columns and girders (, the webs of the framed tube) while the flexural ponent is associated with the axial shortening and lengthening of columns (, the flanges of the framed tube). In a braced tube, the shear ponent of deflection is associated with the axial deformation of diagonals while the flexural ponent of deflection is associated with the axial shortening and lengthening of columns. Following beam analogy, if plane surfaces remain plane (, the floor slabs),then axial stresses in the columns of the outer tube, being farther form the neutral axis, will be substantially larger than the axial stresses in the inner tube. However, in the tubeintube design, when optimized, the axial stresses in the inner ring of columns may be as high, or even higher, than the axial stresses in the outer ring. This seeming anomaly is associated with differences in the shearing ponent of stiffness between the two systems. This is easiest to understand where the inner tube is conceived as a braced (, shearstiff) tube while the outer tube is conceived as a framed (, shearflexible) tube. Core Interactive Structures Core interactive structures are a special case of a tubeintube wherein the two tubes are coupled together with some form of threedimensional space frame. Indeed, the system is used often wherein the shear stiffness of the outer tube is zero. The United States Steel Building, Pittsburgh, illustrates the system very well. Here, the inner tube is a braced frame, the outer tube has no shear stiffness, and the two systems are coupled if they were considered as systems passing in a straight line from the “hat” structure. Note that the exterior columns would be improperly modeled if they were considered as systems passing in a straight line from the “hat” to the foundations。 these columns are perhaps 15% stiffer as they follow the elastic curve of the braced core. Note also that the axial force。土建专业毕业设计外文翻译--抗侧向荷载的结构体系(编辑修改稿)
相关推荐
o be found inappropriate for a standalone system, this because of the difficulty in mobilizing sufficient stiffness under lateral forces. Analysis can be acplished by STRESS, STRUDL, or a host of
n time history was scaled by appropriate factors to represent the 10/50 and 2/50 events. Scaling was done by considering the 5% damped Pseudo Spectral Acceleration (PSA) of a SDOF system with period
until the 26th day. At the end of 28 days of water curing, the specimens are dried and heated up to target temperatures and then cooled to room temperature either in air gradually or in water rapidly
m 0 0 m 2. 6. 2 活载作用下的内力计算 竖向活荷载是可变荷载,它可以单独的作用在某层的某一跨或某几跨,也可能同时作用于整个结构。 对于构件的不同截面或同一截 面的不同种类的最不利内力往往有个不相同的活荷载最不利布置位置,最不利内力的种类来确定。 本设计中将活荷载分跨布置(分为左布活载、中布活载、右布活载三种情况),并求出内力,然后叠加求出控制截面的不利内力。 在分布活荷载下
r mon procedures ranging from crossarch tunnel numerical simulation, using stratigraphic structural model of the structure of the tunnel by the force and deformation analysis (Figure 1, Fi gure 2,
n of a foundation depends on many soil factors, such as type of soil, soil stratification, thickness of soil lavers and their paction, and groundwater conditions. Soils rarely have a single position;