人类空间行为研究ppt23-经营管理(编辑修改稿)内容摘要:

e cutting board back out and put the items back onto the cutting board. Guess which switch controls the projector screen? This picture shows a projector screen in a conference room. The white screen is lowered from the ceiling in front of a blackboard. To the right of the screen are some electrical switches. Guess which switch raises and lowers the screen? The switch next to the screen? No, it39。 s the switch farthest away from the screen! Hard to open Here is a door to a gourmet coffee shop in a designer hotel in New York City. The door is made of solid glass and is very heavy. The top half of the door is clear glass. The bottom half is frosted glass. The handle is in the middle of the door. This makes it very difficult to pull the door open because you can39。 t get any leverage. Please push slowly! Ever wonder why doors are made out of glass? This picture gives a hint. Imagine that these restaurant doors are both closed and someone tries to leave in a hurry just as someone else tries to enter the restaurant from the outside. The doors are made of solid wood and are beautiful to look at but you can39。 t see if anyone is standing on the other side. This is a mop sink This picture is from a restaurant in Santa Barbara. There is no urinal in the men39。 s restroom. The fixture in the corner affords a certain activity. To try to discourage this acti。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。