卡通动画外文翻译(编辑修改稿)内容摘要:
mula plan. 1. Draw a line of action, and then build the oval body and the round head over it. 2. Add perspective guidelines and place the eyes. 3. Set the shoulder, arm, hand, and ear sockets. Draw the nose. 4. Now build the features ears, cheeks, mouth, etc. fit on the coat and the gun. 5. Use an animation board to make a cleanup drawing by placing a clean piece of paper over step 4 and tracing. Little wolfhunter pig 1. Draw a line of action, and then build the oval body and the round head over it. 2. Add perspective guidelines and place the eyes. 3. Set the shoulder, arm, hand, and ear sockets. Draw the nose. 4. Now build the features ears, cheeks, mouth, etc. fit on the coat and the gun. 5. Use an animation board to make a cleanup drawing by placing a clean piece of paper over step 4 and tracing. Cute rabbit Animators usually draw with a scrip to pencil with a no. 2 lead. Then a kneaded eraser is lightly rubbed over the entire drawing to prepare for a cleanup or revision drawing. 1. Draw a circle for the head and a pear shape for the body. 2. Add perspective guidelines around the head. 3. The eyes are placed above the horizontal guideline. The nose starts where the guidelines cross. 4. Add the cheeks, and fit the arms on the top of the body. 5. Draw the ears, eyes, mouth, and legs. 6. Finish the details, and then erase the construction guidelines. Squirrels Here are action ideas for drawing squirrels which is developed using rounded and circular forms. Like other cute characters (see page 32), the head is large in relation to the body. The two front teeth are important and add expression to this character. This squirrel character can be changed to a mouse, rabbit, or chipmunk by simply changing the tail, ears, and feet. More cute characters In this formula you will recognize some features that all these cocky wise guys have in mon. The antics of these loony characters have been some of the funniest on the screen. Goofy character Here is the basic formula for goofy types that act like a simple simon clodhopper: Try using these points to design a character of your own. The heavy, pugnacious character Study the formula (upper above) for these bad boys. It also applies to fourlegged types, such as the bear above and the bulldog sailor on page 72. More animal characters This page contains a variety of animal characters with different expressions. The construction methods include the use of skeletal forms in bination with rounded and circular forms. The facial expressions and body attitudes must plement one another. Notice that some of these forms are squashed while others are stretched to develop the personality. Musical wolf Life is just one wild cartoon take (see page 148)or violent reaction after another for this musician. Rough in the basic construction fit on the details carefully. Anything can happen when wolf sees a pretty girl… continue building the wolf. clean up from construction. Wolf heads Practice drawing these wolf heads, they will help you to draw many other types of heads with various expressions. An animator must be able to draw from all angles. Look at your own facial expressions in a mirror for a guide ... ... Or study other expressions in this book. Lions and tigers Here are suggestions for funny lion and tiger characters. Birds The natural shape of a bird180。 s wing can be changed to a modified (of suggested) arm and hand for certain actions, then changed back to the natural shape. Owls Here are some rough sketches of an owl to show you how its wings can be handled. They can be straight or they can take on the characteristics of a hand with the feathers as fingers. More birds Notice the head sizes. These characters differ greatly in personality and shape due to their proportions. Notice the differences in beaks, legs, necks, and wing sizes. For example, the baby chick has no neck (the head shape overlaps the body shape), while the ostrich180。 s neck is exaggerated. All of the characters on these two pages have been developed using the circle and rounded form method. Different shapes can suggest different personalities: cute, goofy, pugnacious, etc. The belligerant bulldog Spike the bulldog has a barrellike chest, small bottom, heavy arms and legs, no neck, pigeon front toes, and bowed legs. Use construction guidelines to help you draw this bulldog in several different poses and action views. Make a repeat cycle of bulldog running using the drawing at right for position one. See gallop in movements of the fourlegged figure on page 102 for a guide. Bulldog sailor The bulldog has a double jaw with jowls. Draw the circular forms first, and then determine the perspective lines to build the head and assemble the body. In animation the bulldog jowls flop around like coattails in an over。卡通动画外文翻译(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。