单螺纹杆机毕业设计外文翻译--对压缩机单螺杆专用加工机床的介绍(编辑修改稿)内容摘要:

adial clearance purposes. Main structure of such advantages: high precision spindle. At the front spindle diameter φ230mm noodle on the end measuring spindle Beat value of . Φ230mm cylindrical spindle at the front end on the radial axis measurement value of Beat . The second structure of the spindle of a precision spindle accuracy than the first about 50% improve. Main disadvantage of this structure: The principal axis of the more plicated process, the spindle assembly also has the experience necessary to make the workers to operate the spindle achieve the desired numerical accuracy. Third, the depth of the tool feed control Required different processing screw diameter spiral groove depth is also different from the depth of the spiral groove mm from dozens to more than 100 millimeters range around the tool into the institutions required to feed the thousands of ring rotation in order to achieve a screw machining . Feed because of the tool in the tool rotating at the same time achieve motion feed, so on a number of general machine tools used in mechanical, electrical control method of depth of cut does not apply to singlescrew machine. Single screw machine tools give agencies into the following different methods can be feed to control the depth of purpose. The first is: friction clutch and electrical switches to control the depth of the tool feed Its principle is to control depth of cut increases the tool cutter feed mechanism increases the load torque so that the tool feeding mechanism of the friction transmission chain slipping clutch, a mechanical linkage concurrent silent trigger electrical switches, optical signal prompted operator, when manual operator to disconnect the tool into the power sector. The advantages of this control method are: the control method is simple and spare parts processing and operational power from the impact of a sudden. Disadvantage are: processing of different diameter screw to adjust the clutch friction discs pressed the preload spring. Material because of the density of each screw, and the hardness of the existence of subtle differences in the degree of cutting tools sharp differences exist, thus the accuracy of this control method was not too accurate, may lead to screw spiral groove depth tolerance is too large. The second: use of an electromagic clutch, encoder control tool into the mix to the depth of Tool feed system, equipped with electromagic clutch and a tool for detecting the number of rotating ring gear and a gun encoder. It is a tool of control principle hand screw surface encoder to start counting switch, then start counting counting device, when the rotary tool to preset number of laps when the cutting depth is reached, the electromagic clutch automatic off open to the power tool into the concurrent silent, optical signal parts prompted the operator has finished processing. The detection device through the digital display shows the number of feed circles or feed. Torn off and the electromagic clutch, the tool does not only into the rotation with the vertical shaft to the sport. The advantages of this control method are: the depth of the spiral groove screw tolerance control more accurate, because of several significant table shows the depth of processing, or want a few laps and the depth of processing or cir。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。