冲压模具毕业设计外文翻译--模具热处理及其导向平行设计-模具设计(编辑修改稿)内容摘要:
temperature and time, must be properly selected, and w hether using surface quenching or chemical heat treatment the parameters must be rightly determined. It is difficult to deter mine the parameters by puter fully. Since puter technology develops quickly in recent decades, the difficulty with large— scale calculation has been overe. By simulating and weighing the property, the cost and the required period after heat treat ment. it is not difficult to optimize the heat treatment process. Data base for heat treatment A heat treatment database is described in Fig. 3. The database is the foundation of making out heat treatment process . Generally, heat treatment database is divided into materials database and process database. It is an inexorable trend to predict the property by materials and process. Although it is difficult to establish a property database, it is necessary to establish the database by a series o f tests . The materials database includes steel grades,chemical positions, properties and home and abroad grades parallel tables. The process database includes heat treatment criterions, classes, heat preservation time and cooling velocity. Based on the database, heat treatment process can be created by inferring from rules. 5 Tool and equipment for heat treatment After heat treatment process is deter mined, tool and equipment CAD/CAE system transfers the information about design and manufacture to the numerical control device. Through rapid tooling prototype, the reliability of tool and the clamping appara tus can be j udged. The whole procedure is transferred by work, in which there is no man— made interference. 3 Key Technique Coupling of temperature, microstructure, stress and property Heat treatment procedure is a procedure of temperaturemicrostructure—stress interaction. The three factors can all infl uence the property (see Fig. 4). During heating and cooling, hot stress and transfor mation will e into being w hen microstructure temperaturemicrostructure and temperature— microstructure— and stressproperty intera ct on each other . Research on the interaction of the four factors has been greatly developed,but the universal mathematic model has not been built. Many models fit the test nicely, but they cannot be put into practice. Difficulties with most of models are solved in analytic solution, and numerical method is employed so that the inaccuracy of calculation exists. Even so, paring experience method with quali tative analysis, heat treatment simulation by puter makes great progress. 6 Establishment and integration of models The development procedure for die and mould involves design,manufacture, heat treatment, assembly, maintenance and so on. They should have ow n database and mode1. They are in series with each other by the entity— relation model. Through establishing and e mploying dynamic inference mechanism , the aim of optimizing design can be achieved. The relation between product model and other models was built. The product model will change in case the cell model changes. In fact, it belongs to the relation of data with die and mould. After heat treatment model is integrated into the system, it is no more an isolated unit but a member w hich is close to other models in the syste。冲压模具毕业设计外文翻译--模具热处理及其导向平行设计-模具设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。