海洋石油钻井常用英语手册(45页)-石油化工(编辑修改稿)内容摘要:
排气 251. What’s the lag time? 迟到时间是多少 252. The well is now stable. 现在井眼已经稳定 BOP and subsea Equipment 防喷器与水下设备 中国最大管理资源中心 253. Cut off the 30” conductor. 割掉 30”隔水管 254. Weld on the 30” bottom flange. 焊接 30”法兰 255. Hoist and nipple up 30” diverter. 吊装 30”转喷器 256. Change the 5” pipe rams to 31/2” rams. 把这个 5”闸板换成 31/2” 257. Install blind ram. 安装防喷器的盲板芯子 258. Check the seal ring of the conductor. 检查隔水管密封圈 259. Cut off the lifting eye of the conductor. 切割隔水管耳环 260. Test BOP. 测试防喷器 261. Change annular BOP packing. 更换万能防喷器芯子 262. Full pressure test the ram preventers. 对闸板防喷器进行全压试压 263. Test annular BOP at 2500psi. 万能防喷器试压至 2500psi 264. Check annular pressure. 检查环形空间压力 265. Confirm the angle of the guide base. 确定基板角度 266. The thread is covered with the quickrelease protectors. 已戴好快卸护丝 267. Establish the guide lines. 装导向绳 268. Connect the TGB running tool. 接临时导向基板送入工具 269. Land the TGB to sea. 下临时导向基板到海底 270. Retrieve the running tool. 退出送入工具 freestore 20200801 13:49 1. Run the BOP and risers. 下防喷器和隔水管 2. Pick up the marine riser. 吊出隔水管 3. Pick up the slip joint. 起伸缩节 4. Adjust the riser tensioners. 调整隔水管张力 5. Function test the diverter system. 对防喷器系统进行功能测试 6. Retrieve the pin connector. 取出销钉连接器 7. Move the BOP to the moonpool door. 将防喷器移到园井甲板的活动门上 8. Run the test plug. 下试压塞 9. Close the upper pipe ram. 关上部钻杆闸板防喷器 10. Open the kill line valve. 开压井管线阀 11. The pensation capacity is 400000 pounds. 补偿能力是 400千磅 12. The locking load is 1000000 pounds. 锁紧负荷 1000千磅 13. Support the riser. 接隔水管支撑环 14. Remove the hose bundles. 卸下垮接软管 15. Assure the selfcontrolled rotation. 保证自控转动 16. Set the LMRP on the test pump. 将下部防喷器插入总成座放到试压桩上 17. Connect the flex joint to the riser. 连接隔水管与挠性接头 18. Land the BOP onto the well head. 座防喷器到井口头 19. Run the subsea TV for monitoring. 下水下电视观察 20. Remove all the riser running tools. 取出所有的隔水管送入工具 中国最大管理资源中心 21. BOP carrier. 防喷器叉车 22. Lower the universal guide frame. 下放万能导向架 23. Paint mark the top 6 meters of 30” conductor white. 在 30”隔水管的顶部 6米处用白漆涂上记号 24. Check adequate length for guidelines. 检查导向绳的长度是否足够 25. Move temporary guide base (TGB) into moonpool. 将临时导向基板到园井甲板 26. Test pull to check connection. 试拉检查连接 27. Grease TGB and running tool as required. 按要求给导向基板及下入工具上黄油 28. Test fit TGB and running tool. 用下入工具试临时导向基板连接 29. Check for junk inside shoe joint. 检查浮鞋内有无落物 30. Pick up 30” conductor handling slings and shackles. 吊上下 30”导管的索具和卸扣 31. Is slope indicator properly mounted? 水平仪是否装好 ? 32. Ensure subsea TV is in good condition. 确保水下电视处于良好的状态 33. Place BOP stack on the test pump. 将防喷器组放在试压桩上 34. Check condition of all 30” casing connectors. 检查所有 30”套管接头的情况 35. Replace Orings as required. 按需要 , 更换 O性密封圈 36. Attach slope indicator below camera position. 在摄像机下面装上水平仪 37. Inspect and repair diverter. 检查并修理转喷器 38. Prepare spud plate and wireline to check water depth. 准备测深板和钢丝绳测量水深 39. Record all pressure tests on a chart recorder. 用试压表记录试压记录 40. Visually inspect all sealing element. 目视检查所有密封件 41. Check and tighten all bolts. 检查并上紧所有螺栓 42. Bleed off surface accumulators. 地面管线排空气 43. Check for leaks. 检查有无泄漏 44. Lift BOP stack and replace wellhead connector AX ring. 吊起防喷器组并更换连接器 AX密封圈 45. Function test wellhead. 对井口头进行功能试验 46. Fill kill and choke valves with seawater. 将压井阀和阻流阀注满海水 47. Pressure test to 500psi then bleed off test pressure. 试压到 500psi, 然后放掉压力 48. Reduce hydraulic control manifold pressure to 5200 kpa. 将液压控制管线压力减少到 5200千帕 49. Switch to alternate control pod. 把闸门开关倒到控制面板 50. Guidelines are slacked off. 导向绳松了 51. Slack off drill pipe and release running tool. 放松钻杆并卸开下入工具 52. Run subsea TV to observe bit entering the TGB. 下水电视观察钻头是否进入临时导向基板 53. Don’t rotate until hole opener passes through the TGB. 在扩眼器通过临时 中国最大管理资源中心 导向基板前不要旋转 54. Position permanent guide base (PGB) below rotary table. 在转盘下安放永久导向 基板 55. Monitor riser level via trip tank. 用计量罐来控制隔水管内的液面 56. Pressure test to 5000psi. 试压 5000psi 57. Pick up test mandril and place in BOP. 吊起试压防喷器芯子并装入防喷器组 Safety and Firefighting 安全与消防 328. Get a Work Permit before you can start the hot work. 办理作业许可证才能进行动火作业 329. Welding is not allowed. 不准动焊 330. Put on your (safety) helmet. 戴上安全帽 331. It’s a high voltage area. 这是高压区 332. That’s against the rule. 这是违章作业 333. Don’t walk under the crane load. 不要在吊物下走动 334. The repairing is under way. 正在检修 335. Keep your hands clear! (Keep you hands off! Do not touch!) 不要乱动 336. Wear and secure your safety belt. 戴上并系好安全带 337. Life jacket must be worn when working outboard or overhead. 舷外或高空作业要穿救生衣 338. Have your breathing apparatus near you. 保持放毒面具在附近 339. It’s a drill. 这是演习 340. It was a BOP drill. 这是防喷演习 341. Get in the lifeboat in order. 按顺序进入救生艇 342. Put on life jacket! 穿好救生衣 343. Abandon the vessel! 弃船 344. Sound the abandonment alarm! 发出弃船警报 345. Go to the helideck! 去飞机坪集合 346. Aboard the lifeboat. 登上救生艇 347. Aboard the supply boat to shore! 乘拖船上岸 348. Check life saving apparatus periodically. 定期检查救生设备 349. It’s for fire fighting. 这是消防用的 350. Start the fire pump. 启动消防泵 351. This rope is too small. 这根绳子太细了 352. It should be function tested. 需做功能测试 353. A warning notice should be set up. 要挂警告牌 中国最大管理资源中心 354. Do you have an emergency program (contingency plan)? 你们有没有应急计划 ? 355. It must be ready in an emergency condition. 必须始终保持良好的应急状态 356. Will the typhoon hit our rig? 台风要袭击我们的平台吗 ? 357. We will have to evacuate the rig. 我们要撤离平台 358. Personnel on board (POB). 在船人员总数 359. Sound fire alarm. 发消防警报 360. This is a fire drill. 这是消防演习 361. condu。海洋石油钻井常用英语手册(45页)-石油化工(编辑修改稿)
相关推荐
如 ),如果快 于 正常速度 ,则 定一 个 大 于 1的系数 (如 )。 3)以什么为评比基准 ? “正常速度”是指“在 严格 的管理和沒有 奖金 刺激作用的條件下 ,作业人员 的平均操作速度”。 正常速度的例子 相当于 在不 负重 的 条 件下 ,以 27英 寸的步 长 和每小 时 三英里 (合 )的速度 ,在平坦的道路上行走的情況。 或者相当于 用手把一付 52张 的 扑克牌 ,逐
另外,切忌在药店的通道口和安全出口堆放储备药品。 28 陈列的方式 29 药品陈列的性质 供人浏览的陈列 让人产生购买欲望的陈列 这种划分方法是根据顾客心理过程而设计的。 30 顾客购买心理过程 注视 感到兴趣 联想 产生欲望 比较权衡 信任 决定行动 满足 在这一系列心理活动中,有两个过程是非常重要的,一个是“感到兴趣”,因为这关系到顾客是否进店,是否接触药品
医师书写住院病历前的询问病史和体格检查,应在住院医师指导下进行。 住院病历必须由 5年以上上级医师及时审阅,做必要的修改和补充。 修改住院病历应用红墨水。 修改后,修改者用红墨水签名。 被修改六处以上者应重新抄写。 14 入院记录书写要求 入院记录是住院病历的缩影。 要求原则上与住院病历相同,能反映疾病的全貌,但内容要重点突出,简明扼要。 入院记录由住院医师或进修医师书写
自动喷淋等)充分合理,使用可靠。 b) 消防车道设置合理,其位置及转变半径符合国家规范。 c) 消防登高面(场地)设置合理,其位置及面积符合国家规范。 d) 消防通道、门、墙、避难区设置合理,符合国家规范。 3.交通布局 a) 各级道路的功能分配充分 合理,有层次感,线路清晰,便于分流管理。 b) 主要道路和出入口人车分流,在设计和设施配置上考虑到限速要求及回车 余地。 c)
要仔细调查和考虑。 理想的“壳”资源应该有以下几个特点: 规模不大、股价也不高。 这样可以降低购壳成本,容易收购成功。 股东人数在 300~1000 人。 300 人以下的公众股东太少,不值得公开交易;而超过 1000人,新 公司要与这些人联系,并递交资料报告,成本会较高。 另外股东太多,收购时遇到的困难总要多一些。 负债一定不能高,另外还要注意或有负债。 原来“壳”公司股东积累的不满
布建议,以下将作详细阐述。 业态定位 通过以上的分析,建议将项目打造成为: 金贸西区休闲娱乐美食中心 +街区商业服务中心 定位阐释: 以上的业态定位中,以休闲娱乐餐饮为主体,社区商业服务中心为辅助。 从经营布局上看,餐饮娱乐休闲从 1 楼到 3 楼都有分布,而社区商业服务中心最好位于首层内街,这样便于招商,对铺位间隔销售也比较有利。 经营档次特色 项目 万㎡的商业面积不小