公路线形设计外文翻译-公路隧道(编辑修改稿)内容摘要:
centrifugal force also develops gradually. By careful application of superelevation along the spiral, a smooth and gradual application of centrifugal force can be had and the roughness avoided. Easement curves have been used by the railroads for many years, but their adoption by highway agencies has e only recently. This is understandable. Railroad trains must follow the precise alignment of the tracks, and the disfort described here can be avoided only by adopting easement curves. On the other hand, the motorvehicle operator is free to alter his lateral position on the road and can provide his own easement curves by steering into circular curves gradually. However, this weaving within a traffic lane (but sometimes into other lanes) is dangerous. Properly designed easement curves make weaving unnecessary. It is largely for safety reasons, then, that easement curves have been widely adopted by highway agencies. For the same radius circular curve, the addition of easement curves at the ends changes the location of the curve with relation to its tangents。 hence the decision regarding their use should be made before the final location survey. They point of beginning of an ordinary circular curve is usually labeled the PC (point of curve) or BC (beginning of curve). Its end is marked the PT (point of tangent) or EC (end of curve). For curves that include easements, the mon notation is, as stationing increases: TS (tangent to spiral), SC (spiral to circular curve), CS (circular curve to spiral), and ST (spiral go tangent). On twolane pavements provision of a wilder roadway is advisable on sharp curves. This will allow for such factors as (1) the tendency for drivers to shy away from the pavement edge, (2) increased effective transverse vehicle width because the front and rear wheels do not track, and (3) added width because of the slanted position of the front of the vehicle to the roadway centerline. For 24ft roadways, the added width is so small that it can be neglected. Only for 30mph design speeds and curves sharper than 22176。 does the added width reach 2 ft. For narrower pavements, however, widening assumes importance even on fairly flat curves. Remended amounts of and procedures for curve widening are given in Geometric Design for Highways. B Grades The vertical alignment of the roadway and its effect on the safe and economical operation of the motor vehicle constitute one of the most important features of road design. The vertical alignment, which consists of a series of straight lines connected by vertical parabolic or circular curves, is known as the “grade line.” When the grade line is increasing from the horizontal it is known as a “plus grade,” and when it is decreasing from the horizontal it is known as a “minus grade.” In analyzing grade and grade controls, the designer usually studies the effect of change in grade on the centerline profile. In the establishment of a grade, an ideal situation is one in which the cut is balanced against the fill without a great deal of borrow or an excess of cut to be wasted. All hauls should be downhill if possible and not too long. The grade should follow the general terrain and rise and fall in the direction of the existing drainage. In mountainous country the grade may be set to bala。公路线形设计外文翻译-公路隧道(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。