financeleaseinchinaturningchallenge(ppt51)-经营管理(编辑修改稿)内容摘要:

n expiration 3. Amount, timing, number of rental payments 4. Term of lease period 5. Interest/Discount Rate. Owners/User Rights. Transfer (sale to Lessee) All Subject to Agreement between the Lessee and Lessor (art. 243 of new Contract Code) October 1999 XIN DE TELECOM 18 Conventional vs. SPL • Short period, 5 years. • Strict credit check. • Letter of Guarantee. • Amount, timing of financing are fixed • Rent payment is fixed corporate obligation. • Single Equipment. • Not Limited • Flexible Project based. • Flexible. • Master Lease with multiple drawdowns. • Based on specific business performance. • Total project. October 1999 XIN DE TELECOM 19 4, How does SPL work? Capital injection Payback Performance sharing time October 1999 XIN DE TELECOM 20 Funding and repayment targets • Based on the requirements and operating results of the lessee. • Jointly defining the calculation bases. • Periodic inspection and supervision over results. • Revising the performance against the original outlook. October 1999 XIN DE TELECOM 21 Capital Injection Period • Disbursing fund according to equipment purchase contract and construction contract. • Capital injection period and payback period: Conventional in series SPL model with overlap. October 1999 XIN DE TELECOM 22 Annual Capital Funds Requirements 0204060801001201401 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16October 1999 XIN DE TELECOM 23 Calculation Basis • Define business result basis • Measurable amp。 Objective agreedupon in detail • Could be a percentage of: sales, gross margin on sales, ine, operating cash flow October 1999 XIN DE TELECOM 24 Business Result 010020030040050060070080090010001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16October 1999 XIN DE TELECOM 25 The Cash Flow Between Lessor and Lessee 0501001502002501996 1997 1998 1999 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020N e w I n v e s t m e n tR e i n v e s t m e n t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。