businessprocesses(ppt26)-经营管理(编辑修改稿)内容摘要:

ess TCT Mindset: Seamless Business Processes Market Introduction Production Product Concept Design Prototype Test Marketing Engineering Manufacturing Finance and Administration Concrete Ceiling Concrete Floor The Old Mindset: Functionally Optimized PROPRIETARY 169。 1988 Thomas Group, Inc. All Rights Reserved. 11 Process Categories and Measurement  High levels of activity and short cycle times Provide abundant data to permit characterization, analysis, and measurement Are typical of many order fulfillment and production processes  Low levels of activity and long cycle times Are more difficult to characterize and measure Are typical of many design/development and project oriented business processes continued... PROPRIETARY 169。 1988 Thomas Group, Inc. All Rights Reserved. 12 Process Categories and Measurement  Process measures include: Cycle time (TCT) Quality (firstpass yield) Cost (productivity) Despite the binations of high or low levels of activity, measurement and analysis is possible, and in fact is essential to improvement. PROPRIETARY 169。 1988 Thomas Group, Inc. All Rights Reserved. 13 Key Process Measures Process Concepts  Processes consist of subprocesses (phases)  Subsubprocesses can be reduced to work packages and process steps  These steps are divided by the type of work performed, not by function PROPRIETARY 169。 1988 Thomas Group, Inc. All Rights Reserved. 14 Key Process Measures Cycle Time Measures  Process cycle time: The sum or rollup of the subprocess cycle times  Project cycle time: The sum of the critical path cycle times  Response time: The time required to respond to a customer’s request PROPRIETARY 169。 1988 Thomas Group, Inc. All Rights Reserved. 15 Key Process Measures  Firstpass yield For the overall process, FPY is the product of the subprocess firstpass yields  Ontime delivery Meeting the customerrequired delivery da。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。