20xx年考前单选题精练doc13-经营管理(编辑修改稿)内容摘要:
ossible C. that possible D. possible 59. You will see this product wherever you go. A. to be advertised B. advertised C. advertise D. advertising 60. The time is not far away modern munications will bee widespread in China’s vast 中国最庞大的下资料库 (整理 . 版权归原作者所有 ) 第 5 页 共 11 页 countryside. A. as B. until C. before D. when 61. I realize she can be very troublesome, but I think you should apologize for being so angry with her. A. all the same B. once in a while C. in actual fact D. all the time 62. we move the picture over there? Do you think it will look better? A. If only B. What if C. As if D. Even if 63. _________ happened to be no one in the building when the fire broke out. A. It B. There C. This 64. — I didn’t go to the Museum yesterday. — Yes, but I would rather you there too. A. went B. had gone C. should go D. would have gone 65. “Hope for the best and prepare for the worst.” is a proverb, ______ life is beautiful and full of frustrations as well. A. means B. to mean C. meaning D. meant 66. He proved himself a true gentleman and the beauty of his _______ was seen at its best when he worked with others. A. temper B. appearance C. talent D. character 67. Nowadays sending s to each other is a way many a student _______ what they think. A. conveys B. delivers D. account 68. Why does teaching as a career ______ many people? A. apply for B. attract to C. appeal to D. agree with 69. I advise you not to ask him for advice, as he was not good at getting his ideas ____. A. along B. away C. through D. across 70. My money ___. I must go to the bank to draw some of my savings out before I39。 ve none in hand. A. has run out B. is running out C. has been run out D. is being running out 71. Europe has achieved more in controlling the AIDS virus than Asia in the past ten years, _________ the number of people infected with the virus is going up sharply. A. when B. that C. so that D. where 72. How do you find our pany? A little worried. We _________ ground as a leader in the field of IT with the others speeding up development. A .have lost B. are losing C. lost D. were losing 73. The report said a bus went out of control on a highway south of the city and rushed into a river. A. the ,the B. / ,the C. the, / D. /,/ 74. all kinds of knowledge ,he was admitted to a key university. A. Equipped with B. Having equipped for C. Armed for D. Having armed with 75. —How do you to her unkindly behavior? —Only silence. Which of the following is wrong? A. react B. answer C. reply D. respond 698,000 laptops were sold in China in second quarter, percent increase from 中国最庞大的下资料库 (整理 . 版权归原作者所有 ) 第 6 页 共 11 页 a year ago. A. a; a B. the; a C. the; the D. a; the 77. —The government should think about the medical reform again and take measures to improve it. —_________. The medical services and efficiency are not good at the moment. A. You39。 re confusing me B. I cannot agree more C. That39。 s all right D. Go ahead, please 78. Thanks for your trouble. Not at all. I’m _____ pleased to help you. A. too much B. too only C. so much D. only too 79. —Did you know more about the mine accident? —Oh, sorry, I had no idea. I the Rescue Center now. A. will be phoning B. am to phone C. will phone D. phone 80. Look at the floor , Tom ! you watch TV while having a meal? A. Should B. Could C. Would D. Must 81. the plan has been made, let’s get down to it out. A. Now that...carry B. Because...carry C. Since...carrying D. Now...putting 82. that there is no opposition , I will report it to the general manager . A. To provide B. Be provided C. Having provided D. Providing 83. Some friends tried to settle the quarrel between Mr. and Mrs. Brown without hurting the feeling of , but failed . A. none B. either C. both D. neither 84. It’s not books you read but the way you read them that decides how successfully you gain knowledge . A. a number of。 in which B. the number of。 / C. a good many。 which D. quite a few。 in which 85. The police got to was once an old school the peasants used as a store . A. what , that YCY B. where , which C. where , that D. which , where 86. Does this car give you good _____for your money ? A. value B. price C. worth D. cost 87. . You were tired out after the mountain climbing, weren39。 t you? Yes, ______. I could hardly rise to my feet. A. not at all B. not a little C. not a bit D. not really 88. At last the two panies an agreement and began to trade with each other . A. came B. concluded C. reach D. make 89. —Where Chongqing do you decide to build the factory ? —Nobody our manager knows . A. except。 besides B. but。 besides C. but。 but D. except。 besides 90. Nowadays, within a short walk along a busy street, you are _________ to find a chain store _________ — a fastfood restaurant, a bakery, or a supermarket. A. probable。 some。20xx年考前单选题精练doc13-经营管理(编辑修改稿)
相关推荐
,情节轻微。 9 在公司内当众污辱、辱骂他人。 10 非因公需要带着酒意上班者。 (原先为大过 ) 11 退房人员私自入住公司宿舍或住宿人员私自调房。 12 在严禁饮食的场所(生产车间及仓库)饮食。 13 对上级主管指示交办工作,无正当理由而未如期完成或处理不当。 14 违反公司工作流程或越权审批,情节较轻的。 15 因工作失职、失误或违反规定,给公司造成经济损失人民币 1000元 —
,中国菜籽油没有形成全国性的品牌。 菜籽油品类正在逐步的萎缩。 以前做的较好的菜籽油品牌 鲤鱼牌已经在市场上销声匿迹。 • 消费者对菜籽油的认识有误区:认为其还是低质低价的油品,没有营养。 • 目前国外进口的低价大豆油和棕榈油冲击大陆低端食用油市场。 抢占了很多菜籽油的市场份额。 • 国家及厂家对新改良的双低菜籽油宣传引导不够,消费者的消息接收来源不对称,造成目前菜籽油市场日益萎缩。 •
是公司的宝贵财富,我们追求极大化每位员工的事业价值与空间,在英大人寿的大家庭里 “ 你是最重要的 ” 18 19 19 战略目标 战略步骤 战略途径 战略保障 发展战略 发展战略 20 未来成功上市并使公司价值最大化 战略目标 20 21 初创阶段( 2020~ 2020) 主要目标是健全经营模式,夯实管理基础,建设高素质队伍,为公司快速发展做好准备 加速发展阶段( 2020~
中和垄断,一些相邻城市、相邻地区的会展将合并举办,强强合作,形成规模效应,形成区域性的会展中心。 我们看到每年两届的广东美博会、一年一度的上海美博会等已成为业内最具影响力和吸引力的会展。 ,展会的目标市场和定向更加明确。 中国最大的管理资料下载中心 (收集 \整理 . 部分版权归原作者所有 ) 第 10 页 共 22 页 在每年的展览会中,尤其是有很多地区性的展览为了增加参会客商的数量
额也会提高,美容品将成为女性的主流产品。 美发用品向高中档发展 ,儿童和男士化妆品也会得到发展。 : 在 2020 年全国重点大型零售企业商品零售额中:化妆品类增长 %;洗涤用品类增长20%。 从近几年的动向看,美容类的产品上升得很快,有专家预测到 2020 年美容类的产品要占到3540%,要占到第一位。 : : 我 国城市化妆品市场已由成长期逐步进入成熟期,品牌众多,全国有 3000 多个品牌
防安全责任书》 《 保 险 承 诺书》 《房屋交接确认书》 《 装 修 申 请表》 《装修图纸递交明细表》 《 装修施工流转单》 《装修档案目录清单》 《装修手册》 5 装修 管理 2 指定工程管理。 ,并保留一份合同。 10%管理费。 ,由商户与承包商接洽。 客服助理 《委托施工协议》 项目 工作要点 工作标准 管理控制 责任人 工作记录 支持文件 5 装修管理 3 进场手续办理 、营运部