中英文翻译资料----开关电源发展轨迹(编辑修改稿)内容摘要:
rspective, for several decades to promote switching power supply performance and constantly improve the technological level This should mark is: 1. A new highfrequency power semiconductor devices to achieve the development of highfrequency switching power supply may have. IGBT such as power MOSFET and has been fully replace the power transistor and SCR, so that small and mediumsized switch power 下作 Frequency of up to 400 kHZ (ACDC) and 1 MHZ (DCDC) level. Ultrafast restore power diode, MOSF ET asked further rectification technology for the development of efficient lowvoltage output (for example, 3 V) switching power supply for a possible . Are now exploring the development of highperformance high temperature carbonation power to block conductor devices 2. Softswitch technology enables efficient highfrequency converter with the realization may be. PWM switching power supply switchmode by hard work (on / off process BU voltage drop / rise and the current rise / fall waveform is overlap), thus the switching losses. Highfrequency switching power supply can reduce the volume of weight, but switching losses are greater (power and frequency is directly proportional). So we must Switching on power than / current wave of cross more technology, the socalled zerovoltage (ZVS) / the current (ZCS) switching technology, or softswitch technology (as opposed to PWM switching technology in terms of hardware), the small softswitching power supply efficiency Can be increased to 80 a 85 per cent. 1970s, switching power supply market was softswitch technology laid the foundation. After the new softswitch technology will continue to emerge, such as the quasiresonant (1980s) fullbridge phaseshift ZVSPWM, constant frequency ZVS PWM/ZCSPWM (80 in the late) ZVSPWM active clamp。 ZVTPWM/ZCTPWM (90 in the early) fullbridge phaseshift ZVZCSPWM (90 years), and so on. China has The latest softswitching technology to 6 Kw power of munication, efficiency up to 93% 3. Control Technology progress. Such as the current control and multiloop control, load control, a cycle control, power factor control, DSP control, and the corresponding private Integrated control of the successful development of the chip, so that switching power supply has greatly improved dynamic performance, the circuit also greatly simplified 4. Active Power Mission of Correction ( APFC) the development, improve the ACDC switching power supply power factor. Due to the importation Rectification of a capacitora device, ACDC switching power supply and a large class of the rectifier power supply electronic equipment (such as inverters, UPS), and so。中英文翻译资料----开关电源发展轨迹(编辑修改稿)
相关推荐
dding usually holds in the Western church and the priest presides at Wedding ceremony. Under the witness of the godfather, according to their individual thought, they get married. Every phase of
340E 自动变速器传动系统结构简图 C0 — O/D 直接挡离合器; C1 — 前进挡离合器; C2— 直接挡离合器; B0— O/D 制动器; B1— 2 挡滑行制动器; B2— 2 档制动器; B3— 一档兼倒挡制动器; F0— O/D 单向离合器; F1— 1 号单向离合器; F2— 2 号单向离合器 统 液压控制系统由油泵、阀体、储压器、离合器和制动器以及连接所有这些组件的液压管路组成
psticks must be put in middle of the bowl in a vertical row. No matter whether there are remain food on the chopsticks, never lick it. When talking with a person, you should put them down。 don‟t
并提供负载电流。 这样通过对开关管的合理控制,获得与交流电源电压同步的正弦输入电流 本科生毕业 设计(论文) 11 波形和稳定的直流输出电压。 其控制部分原理如下:主电路的输出电压 Uo和基准电压 Uref比较后,输人给电压误差放大器UEA,整流电压 Udc 检测值和 UEA的输出电压信号共同加到乘法器的输入端,乘法器的输出则作为电流反馈控制的基准信号,与开关电流检测值比较后,经电流误差放大器
e of classical PID controller for both the tracking problem and the step disturbance rejection. The fuzzy sets are assumed to have initially symmetrical layout and the parameters of both regulators
ata for being in conjunction with work too more and more closely, different section usually needing visitting can renew synchronously, or at least can in certain time partition the proceeding data is