星火30篇文章贯通考研词汇文本(doc47)-考试学习(编辑修改稿)内容摘要:
) 第 6 页 共 47 页 the world of people who really did know how to live. I found a few of my aunts in their fashionable outfits by an old Cadillac pretending to drink whisky. Many of the photographs were taken in COney Island and CapeCod. I especially love the photographs of the bathing beauties and their swimsuits. THe suits are quite modest by today39。 s standards but the young women didn39。 t seem to care. They were staying at such places as Newport Beach and Cape Cod having the time of their lives running in and out of the tide. One photograph had a vendor(小 贩 ) selling dogs(热 狗 )by a coaster(轮 船) at COney Islanda younger picture of my mother with here brown hair and blue eyes eager to go on board with my Dad. He looked a bit frightened in the picture as I could see he was lolding on tightly to the bar to the coaster,his black hair flying in the breeze. I smile when I look at that picture because it is hard to imagine anyone39。 s Dad ever being a kid. He looked like he was having a great time probably because he was with my mother. SHe is smiling in the picture and wearing a white blouse(女 衬 衫) ,blue shorts and tennis shoes. She is quite a looker(美女) ,I can see why my Dad liked her so much. I dig down to the bottom of the box and see two large photographs. One is dated 1900 and the other one is dated 1997a recent picture that looks similar to the older one. The older picture looks familiar because it is taken in the same placethe summer home. I will describe the older photograph as very interesting in the style of dress 中国最大的管 理 资料下载中心 (收集 \整理 . 大量免费资源共享 ) 第 7 页 共 47 页 and exactly where the people are sitting. They are posed outside the cottage by a small tree that is still there today. A woman is sitting in a rocking chair, with here black hair pulled up in a bun(脑 后的女髻) .She is not smiling but looking away from the camera and wearing a long black dress. Another woman is wearing a white blouse with a necktie(领结 ) and a long black skirt. Her hair is also long and blonder(金 黄 色的) but pulled back in a bun. There are two men on either side of a wooden table. BOth men appear older and are dressed in hats and suits and ties,trousers and SUnday shoes. Neither is smiling. (I have the distinct feeling that the women are their wives and it is Sunday.) they probably are hungry for their roast beef and potatoes,but that is just my guess. There is a young boy,probably about 13 in the photograph, He is wearing a white blouse,black shorts,long black socks and tan sports shoes. He is petting a black dog that is sitting on top of the round wooden table. The boy is bending down and he isn39。 t smiling either. It must have been hot outside and he probably wants to go for a swim with the dog. The water is just below them and he is probably wondering why he has to take this stupid picture all dressed up on a Sunday. I notice that the color of my cabin was quite different in 1900 and it was much smaller. The color was green,with white railings(栏 杆 )around the porch and steps leading down to the patio(院子 ). That is where the picture of this Smart Family was taken. The family appears rather stiff in the photo but I am sure that they had a good laugh after the Sunday dinner was served. 中国最大的管 理 资料下载中心 (收集 \整理 . 大量免费资源共享 ) 第 8 页 共 47 页 The second larger photograph is of my own family about 1997. It is also in black and white. We didn39。 t wear andy older clothers but used our own clothes. The tree in the background has grown to enormous heights and is still standing. The steps leading down to Mousam Lake have cracked and are in awful need of repair. Believe it or bot,we still own the old wooden table and all of the rocking chairs owned by the Smart Family. I did a search of the Smart Family and they were originally from Portsmouth(朴茨茅斯) . At least five other families owned my cottage before my father bought it in 1950 for three thousand dollars. The cottage es with thirteen acres of land that I still own along with my seven brothers and sisters. It was passed on to me when my mother died. We have formed the Camp Fund to pay the taxes and preserve our legacy. It is a beautiful cabin on a prime spot on Mousam Lake. I was not here when this photo was taken and it hangs in the livingroom of the cabin. Many vistors ment on it and think it is quite amazing to have a house for so long. The hitory of the house is interesting to view from photographs. Around the table are my brothere Bob just wearing a casual shirt and shorts(smilling), Annie wearing a TShirt and shorts. Mike wearing a white shirt and long nylon trousers not smiling, Mary,whom I couldn39。 t tell what she was wearing,my Mom,her white hair and her beautiful blue eyes and smile,was wearing a peach blouse and slacks,my Dad wasn39。 t alive for this photo, he died in 1986. Lastly in the picture is my brother John,wearing a white vest,trousers and suspenders. He slicked(使光滑、 顺 滑 )back his black 中国最大的管 理 资料下载中心 (收集 \整理 . 大量免费资源共享 ) 第 9 页 共 47 页 hair for the photo to appear in the period style. He wasn39。 t smiling either. The only difference is that my cotaage is painted brown with a larger porch and some additional buildings. My father loved to build things and he was constantly improving the cabin. He built a deck downstairs,and also a dock for his many boats. He also designed a gliding swing and a piic table. All of these photographs remind me that people are not so very different. We all want to enjoy living and be together。星火30篇文章贯通考研词汇文本(doc47)-考试学习(编辑修改稿)
相关推荐
式上多多借鉴,想也可采用捆绑方式进行促销。 应对大众家庭消费,可推出大众健康型品牌,传播 “**” 牌普洱茶的绿色保健功能。 由于家庭消费品的购买者主要为家庭妇女,因此,应在销售终端的积极采取生动化陈列、现场促销、折扣搭赠、小礼品赠送等推广方式。 旅游消费 —— 分众营销策略 通常旅游购买者都是外地消费者,影响其对当地土特产的购买因素主要有:以前形成的认识;当地熟人的推荐
才给你回款。 一般也都要铺底货。 三、普药的市场开拓策略新思维 渠道促销开拓法 即在全国各大药市、各大医药公司和新兴的药品跨区域快批公司,覆盖面广,批发点多,厂家可以在其各种批发点设立专职的 促销员 和促销专柜,把你的产品系列和奖品系列陈列出来,见到顾客就让 促销员 推荐,采用推和拉相结合的模式来开拓市场。 我国药市对全国中小城市、农村市场的辐射能力很强,而且有些不正规的药市屡禁不止。
岸发达。 即使是购买日常用品,也要有一段不近的路程。 放弃了在没有自行车道的公路上骑车的念头,我们或步行权当锻炼或享受朋友们的好心的搭载帮助。 很幸运,新结识了很多的好朋友包括同事,教授,普渡大学 Iaeste 的 Local Committee ,热情慷慨的帮助我们解决了几乎生活中的一切困难,使我们这些外国的实习生没有感到丝毫的无助与不适。 工作 普渡大学在美国是一所著名的以工科见长的学校
颂情爱、品尝美味成为社会思潮,这才有 “目极 中国最庞大的数据库下载 中国最庞大的数据库下载 世间之色,耳极世间之声,身极世间之鲜,口极世间之谭。 ”的呼声。 蔬食不仅是养生,也是美味,美食家们从蔬食中发现其鲜无比的口味,李渔一言道出清淡的奥妙说 :“论蔬食之美者,曰清、曰洁、曰芳馥,曰松脆而已矣。 不知其至美所在,能居肉食之上者,只在一字之鲜。 ”(10) 士大夫们更以吃遍天下鲜为人生一大乐事
是恒定不变的,而共振吸脂从根本上减少了脂肪细胞的绝对数量。 只要保持良好的生活习惯,一次减肥将永不反弹,远比服药、运动、节食更彻底。 、更安全、恢复更快 日式吸脂采用先进的共振仪,创口更小,更隐蔽,术后不留疤痕,无需住院,配合先进的监护设施及无痛技术,减肥更安全恢复更快。 、效果更好、更个性化 日式吸脂注重使用技术保留少量脂肪,使术后肌肉保持弹性和细腻光滑。 日本是一个追求细腻、精致、完美的民族
良为健康餐饮连锁。 在确立了品牌的核心价值以后,我认为,如何把品牌有效地传播出去,建立起品牌与消费者之间的广泛理解与共识,传播布局至关重要。 为了让 “ 味千拉面 ” 品牌再次迅速突围,在市场推广的过程传播方面,遵循品牌突围的 “ 快、稳、准 ”三个原则思路,以对应的 “ 借势聚气,捆绑提升,造势成名 ” 三个操作策略,通过新闻软文的跟进,产品展示和促销活动等许多元素,作为整体传播策略。