plc相关问题外文翻译-plc设计(编辑修改稿)内容摘要:
mistake creates, PLC the outside should install the essential protection circuit. (1) Stops the electric circuit anxiously. Regarding can cause the user to cause the damage the dangerous load, besides performs in the control procedure to consider, but also exterior should design the emergency stop electric circuit, causes when PLC breaks down, can cause the injury load power source reliably to shut off. (2)Fragment. The forward and reverse revolution and so on reversible operation39。 s control system must establish the exterior electric appliance interlock 外文翻译( 原文 ) 7 protection。 the reciprocation moves and rises and falls motion the control system, must establish the exterior spacing protection circuit. (3)The programmable controller has selfchecking functions and so on surveillance timer, when inspects exceptionally, outputs pletely the closure. But when programmable controller CPU breakdown cannot control the output, therefore, regarding can cause the user to cause the damage the dangerous load, to guarantee that the equipment moves under the secure state, must design the external circuit to protect. (4) Power source load protection. If the PLC power source breaks down, the interruption interval is short in 10 seconds, PLC works not affected, if the power source interrupt surpasses 10 second or the power source drops surpasses the permissible value, then the PLC stop work, all output also separates。 when the power source restores, if RUN input connection, then operates carries on automatically. Therefore, to establish the essential current limiting protection circuit to some easy overloading39。 s input device. (5) Significant breakdown warning and protection. Regarding easy to have heavy accident39。 s place, to guarantee the control system when the heavy accident occurs still the reliable warning and the protection, should have with the significant breakdown the contacting signal to output through the external circuit, caused the control system to move under the safe condition. Fifth, PLC earth the good earth is guaranteed that the PLC reliable work the important condition, may avoid the heterogametic the voltage surge harm. PLC meets the grounding and machine39。 s ground terminal docking, meets the grounding the crosssectional area should not to be smaller than 2mm2, the earth resistance is smaller than 100Ω。 If must use the expansion unit, its ground point should accept after checking with the elemental area earth in the same place. In order to suppress adds in the power source and the input end, outport39。 s disturbance, should joins the specialpurpose grounding to PLC, the ground point should with the power 外文翻译( 原文 ) 8 equipment (for example electrical machinery) the ground point separate。 If cannot meet this kind of requirements, must achieve with the other equipment public earth, forbids to establish contacts the earth with other equipment. The ground point should approach PLC as far as possible. Sixth, the redundant system and hot backup system in profession in and so on petroleum, chemical industry, metallurgy certain systems, the request control device has the extremely high reliability. If the control system breaks down, will create the production suspension, the raw material massive wastes or the equipment trouble, will create the enormous economic loss to the enterprise. But depends on the enhancement control system hardware39。 s reliability to satisfy the above request is only not enough, because the PLC itself reliable enhancement has certain limit. Uses the redundant system or the hot backup system can solve the above problem quite effectively. (1) Redundancy control system in redundancy control system, entire PLC control system (or in system most important part, if the CPU module) of two set of identical system position. Two CPU module use same user program multitasking, one is advocates CPU, another is spare CPU。 advocates the CPU work, but the spare CPU output is forbidden, when advocates CPU breaks down, spare CPU automatic investment movement. This cut process is controlled by the redundancy processing unit RPU, the switching time in 1~3 scanning periods, the I/O system39。 s cut is also pletes by RPU. Hot backup system in the hot backup system, two CPU with the munication connection connects in together, which is at circular telegram condition .When the system presents the breakdown, advocates CPU informs spare CPU to make the spare CPU work. This cut process is not too generally quick, but its structure is simpler than the redundant system. Under a lot of circumstances we are total to like to adopt the string to bine the conversion chip to carry on deliver, under this kind of circumstance not need us 外文翻译( 原文 ) 9 to carry on to deposited the machine to establish too and plicatedly, but carry on the data exchanges through the data transmission instruction directly, but is not a very viable way in the correspondence, because the PLC of the other party must has been wait for your data exportation at the time of sending out the data, it can39。 t do other works. When you are reading the book, you hear someone knock on door, you stop to start up of affair, open the door and bine to continue with the one who knock on door a dialogue, the telephone of this time rang, you signal hint to connect a telephone, after connecting the telephone through, return overdo e together knock on door to have a conversation, after dialogue plete, you continue again to see your book, this kind of circumstance we are called the interruption to it, it has the authority, also having sex of have the initiative, the PLC had such function .Its characteristics lie in us and may meet the urgently abrupt affairs in the operation process of the equipments, we want to stop to start immediately up of work, the whereabouts。plc相关问题外文翻译-plc设计(编辑修改稿)
相关推荐
厢在运行中偏斜或摆动。 常闭块式制动器在电动机工作时松闸,使电梯运转,在失电情况下制动,使轿厢停止升降,并在指定层站上维持其静止状态,供人员和货物出入。 轿厢是运载乘客或其他载荷的箱体部件,对重用来平衡轿厢载荷、减少电动机功率。 补偿装置用来补偿曳引绳运动中的张力和重量变化,使 曳引电动机负载稳定,轿厢得以准确停靠。 电气系统实现对电梯运动的控制,同时完成选层、平层、测速、照明工作。
(一) 、 气缸的选择 气缸选型主要是根据所加负载和运动行程以及工作条件来确定,以下选型过程主要是根据《 SMC 气缸选型方法》进行的。 依次确定气缸内径和最大行程 量。 5 1. 确定气缸内径 ①根据附录图解法求气缸内径从而确定负载率为: ②工作压力 ③气缸垂直负载为: 30,介于 24 到 39 之间 ④根据以上数据和工作状态:查表可知气缸内径为 32mm 2. 确定气缸最大行程量。
装属性: 电阻 —— AXIAL系列 电容 —— RAD系列 晶振 —— XTAL1 AT89S52—— DIP40 蜂鸣器 —— RAD 电源和地插座 —— 二极管 —— DIODE 三极管 —— TO5 按键 —— DIP4 电解电容 — RB系列 5) 生成网络表 2. PCB 设计 1) 设置 PCB设置环境,规划 PCB板。 设置电路板尺寸大小、层数 2)导入网络表,并且检查错误。
的工作方式 1)输入采样阶段,在此阶段,顺序读入所有输入缎子通断状态,并将读入的信息存入内存,接着进入程序执行阶段,在程序执行时,即使输入信号发生变化,内存中输入信息也不变化,只有在下一个扫描周期的输入采样阶段才能读入信息。 2) 程序执行阶段: plc 对用户程序扫描。 3)输出刷新阶段:当所有指令执行完毕通过隔离电路,驱动功率放大器,电路是输出端子向外界输出控制信号驱动外部负载。 PLC
新版对外承包工程项目贷款贴息初审汇总表(表格模板) 序号 申请企业名称 执行企业名称 项目名称项目合同金额 贷款银行 贷款金额贷款利率年度贷款付息金额按贴息2个百分点计算应贴息金额123456789主管负责人签字: (公章) 主管负责人签字: (公章)对外承包工程项目贷款贴息初审汇总表省级商务主管部门 审核意见: 省级财政部门审核意见:中 央 管 理 企业
串并联等术语,所不同的是,梯形图中每个元件的名称和编号有PLC 的特别规定;同一编号继电器的触点(既有常开又有常闭)可以根据需要无限引用;所有触点及其构成的控制回路都是通过软件编程实现其功能的,并无实际连线;此外梯形图中所有的输出元 素都是安排在右侧与母线相连,图中每包含一个被控元素的逻辑段称为一个梯级。 梯形图中继电器的线圈、常开触点及常闭触点符号常用下图中的符号表示。 梯形图比较形象、直观