plc在智能建筑电梯控制系统中的应用中英文翻译资料-建筑结构(编辑修改稿)内容摘要:

etc. The DC power which is provided to PLC can be used as indicator light power. The PLC output points can be directly used to control transducers for the purpose of electrical motor’s positive turn and reverse ,stop and control each segment velocity and so on .OMRON pany’s C 200HE series PLC has been selected as major control configuration according to the input/output points and the length of user’s program. On the other hand we also consider that the system’s function can be expanded in the future .C 200HE series PLC ,whose perfect function and strong reliability, can meet these demands at present. Moreover, input and output devices are needed in elevator control system, besides the PLC, system’s major control device. Part of signal hookups of the elevator electric control system is shown in . The control cabi is the control center, from which we can send out various control mands. The control cabi often was installed in the elevator room .The electric devices and signal systems, for example the contactors, relays, capacitances, resistors, rectifiers and transformers etc., are centralized in the control cabi. The Power of the control cabi was imported from the chief power of the elevator room. This power was also introduced into control panel by soft cables and was linked with each control buttons. The power lines which was derived from control cabi was delivered to tow electric motors. Others control lines and signal lines were separately sent to each floor junction Ⅳ . Program design The design includes two parts: hardware and hardware design is the base of software. Considering that the control demands are relatively plex, we design the programs separately according to the control function. Furthermore, we follow the principle as follows: When the elevator is ascending, the ascending demands are prior to other demands。 When the elevator is descending, the descending demands are prior to other demands. The Sequential Function Chart (SFC) is adopted during the boxes to form elevator’s executive circuitry design. It is a method specially used in industrial sequential control. The SFC method can describe the system’s working procedure in great detail. For example there is a three layers intelligence building. A subprogram, the calling from the third floor as elevator in the first floor, is shown in Fig. 3 with SFC. When all SFC are drawn and I/O address lists are。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。