plc中英文资料外文翻译-plc设计(编辑修改稿)内容摘要:
already no longer hoped to see too many control buttons, they damage not only and easily and produce the artificial error easiest, small is not a main error perhaps you can still accept。 But lead even is a fatal error greatly is what we can39。 t is tolerant of. New technique always for bringing more safe and convenient operation for us, make we a lot of problems for face on sweep but light, do you understand the HMI? Says the HMI here you basically not clear what it is, also have no interest understanding, change one inside text explains it into the touch to hold or manmachine interface you knew, it bines with the PLC to our larger space. HMI the control not only only is reduced the control press button, increase the vivid of the control, more main of it is can sequence of, and at can the change data input to output the feedback with data, control in the temperature curve of imitate but also can keep the manifestation of view to e out. And can write the function help procedure through a plait to provide the help of various what lies in one39。 s power, the one who make operate reduces the otiose error. Currently the HMI factory is also more and more, the function is also more and more strong, the price is also more and more low, the noodles of the usage are wide more and more. The HMI foreground can say that think 176。 to be good very. At a lot of situations, the list is is a smooth movement that can39。 t guarantee the equipments by the control of the single machine, but pass the information exchanges of the equipments and equipments to attain the result that we want. For example fore pack and the examination of the empress work preface, we will arrive wrapping information feedback to examine the place, and examine the information of the place to also want the feedback to packing. Pass the information share thus to make both the chain connect, being a total body, the match of your that thus make is more close, at each other attain to reflect the result that mutually flick. The PLC correspondence has already e more more body now its value, at the PLC and correspondence between PLCs, can pass the munication of the information and the share of the datas to guarantee that of the equipments moderates mutually, the result that arrive already to repair with each other. Data conversion the adoption RS232 between PLC connect to e to the transmission data, but the RS232 pick up a people and can guarantee 10 meters only of deliver the distance, if in the distance of 1000 meters we can pass the RS485 to carry on the correspondence, the longer distance can pass the MODEL only to carry on deliver. The PLC data transmission is just to be called a form to it in a piece of and continuous address that the data of the inner part delivers the other party, we, the PLC of the other party passes to read data in the watch to carry on the operation. If the data that data in the watch is a to establish generally, that is just the general data transmission, for example today of oil price rise, I want to deliver the price of the oil price to lose the oil ally on board, that is the share of the data。 But take data in the watch for an instruction procedure that controls the PLC, that had the difficulty very much, for example you have to control one pedestal robot to press the action work that you imagine, you will draw up for it the form that a procedure bine with the data sends out to pass by. The form that information transport contain single work, the half a work and the difference of a workses .The meaning of the single work also is to say both, a can send out only, but a can receive only, for example a spy he can receive the designation of the superior only, but can39。 t give the superior reply。 A work of half is also 2 and can can send out similar to accept the data, but can39。 t send out and accept at the same time, for example when you make a phone call is to can39。 t answer the phone, the other party also。 But whole pair works is both can send out and accept the data, and can send out and accept at the same time. Be like the Inter is a typical example. The process that information transport also has synchronous and different step cent: The data line and the clock lines are synchronous when synchronous meaning lie in sending out the data, is also the data signal and the clock signals to be carry on by the CPU to send out at the same time, this needs to all want the specialized clock signal ea。plc中英文资料外文翻译-plc设计(编辑修改稿)
相关推荐
构更趋合理的方向发展。 微电脑控制功能、新型的洗涤方式、高速脱水以及低噪音等方面都有了很大提高。 近几年,我国的洗衣机制造技术得到迅速发展,从生产单桶波轮式、双桶波轮式洗衣机逐步向套桶波轮式全自动洗衣机和滚筒式全自动洗衣机方向发展,其中全自动洗衣机的年产量已占洗衣机总产量的 10%左右。 生产规模不断扩大,技术工艺日趋完善,产品质量稳步提高,已生 产出技术性能优良的多种牌号的全自动洗衣机供应市场
ric properties are typically specified throughout a plete control system (see namespaces). 2 Sequence/ State programs Sequence programs can run on any processor in a control system. The runtime
立指令,其后不带操作元件号,因此, ORB 指令不表示触点,可以看成电路块之间的一段连接线。 如需要将多个电路块并联连接,应在每个并联电路块之后使用一个 ORB 指令,用这种方法编程时并联电路块的个数没有限制;也可将所有要并联的电路块依次写出,然后在这些电路块的末尾集中写出 ORB 的指令,但这时 ORB 指令最多使用 7 次。 将分支电路(并联电路块)与前面的电路串联连接时使用 ANB 指令
very big. Its request lies in can39。 ting have an error margins in a datas deliver, otherwise the whole piece according to pare the occurrence mistake, this on the hardware is a bigger difficulty.
e and easily, in a lot of equipments, the people have already no longer hoped to see too many control buttons, they damage not only and easily and produce the artificial error easiest, small is not a
考 虑到控制成本,占地等综合因数还是采用 PLC 集中控制方式较为合理。 结合 PLC 控制与集中控制,本篇论文对皮带运输机就采用 PLC 集中控制方案。 6 2. 控制系统的硬件电路设计 PLC 选型及 I/O 表的分配 输入信号 : 启动开关 需要 1个输入端 停车开关 需要 1个输入端 故障开关 需要 4个输入端 以上共需 6个输入信号点,考虑到以后对系统的调整与扩充,留有 15%的备用点