igcc战略思想在中国的发展外文翻译(编辑修改稿)内容摘要:
g life cycle and are not easy to upgrade the technologies involved, decisions made now will have a major impact on the coal utilization mode in the ing , the future 20 years is the strategic opportunity period of the transition of conventional coal utilization. Because the Integrated Gasification Combined Cycle (IGCC) can supply electricity, liquid fuels, hydrogen and other chemicals if needed at low pollu tion level,and has the potential to make carbon capture and sequestration much easier and cheaper than traditional pulverized coal boiler power plants, it should be the strategic direction for China to meet the requirements of the energy and environmental challenges. This paper makes an overview of China’s energy and environmental challenges and opportunities, and describes the IGCC technology. It discusses why China should develop IGCC. What are the foundations for China to develop IGCC? What are the rational driving forces to develop IGCC in China? What is the reasonable developing path of IGCC in China? Keywords: China。 IGCC。 Sustainable development 4 1. General background . A coaldominated energy mix will long exist in China China is the world’s largest producer and user of to the greater than 10% economic growth in the past10 years, the Chinese demand for coal grew rapidly. both energy p。igcc战略思想在中国的发展外文翻译(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。