bs结构外文翻译(编辑修改稿)内容摘要:
ed work hardware environment cases with the telephone work, leased equipment. Information own management. C/S stronger than the scope of general operating systems and browsers as long as there is on line. For different security requirements: C/S relatively fixed user group oriented general, the control of information security is strong. General highly confidential information systems used C/S structure appropriate, through the issuance of publicly B/S information. B/S built on the Wan, based on the ability to control security weak in the face of the user group is unknown. Procedural framework for the different: C/S procedures can focus more on processes。 multi level access to the petence of the operating speed can be less consideration. B/S visit to the security and speed of multiple considerations, based on the need for greater optimization basis. B/S, C/S have higher requirements than the procedural framework is the development of the structural trend from Ms. Net series BizTalk 2020Exchange2020, prehensive support work ponents erection system. Sun and IBM pushed the Java Bean ponent technology to enable B/S more mature. Different software trusted: C/S procedures could inevitable holistic considerations, the trusted ponents of the ponents is in the trusted B/S request of the good. B/S of multiple structures, ponents for relatively independent functions. To the relatively better trusted. On the table can be used to buy, instead of doing the stone wall in the tables. Maintaining different systems: System software maintenance is the survival cycle, big spending, important C/S procedures as a result of the overall importance of the overall mission to address the problems and the system upgrading. Upgrading is difficult, and maybe doing a new system. B/S ponents position of the replacement of individual ponents and systems to achieve seamless escalation. Minimize system maintenance costs. Downloaded from the Inter installed on the users themselves can achieve promotion. Different treatment: C/S procedures to deal with users face fixed, and in the same region, the security requirements of high demand, and related operating systems. Is the same system should be. B/S built on the wide area work, the different user groups, geographical dispersion, and this is C/S unable to do so. Relations with the operating system platform smallest. Different user interface: C/S are established Windows platform, the performance of limited means, to reflect the general requirements established in the browser B/S higher, a more rich and vivid manifestations and users exchange. And the most difficult to reduce, reduce development costs. Different informati。bs结构外文翻译(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。