24ghz_t-bus_eib智能化医院控制系统外文翻译(编辑修改稿)内容摘要:
nt hall through lit sensor at day time. When the natural light is intense, closes partial lights, otherwise, then opens the certain light, makes the outpatient hall to maintain the constant degree of illumination. Simultaneously may conserve energy. * At night may act different degree of illumination according to the patient current capacity. * Controls the visor volume curtain of the hall through the light sensor. When the summer light is intense, automatically lays down the visor volume curtain, in order to conserves energy. * May control the light, the visor volume curtain of the out patient hall through the center control room puter. 3. The treatment of the inspection, the surgery, the diagnosis, the rescue and so on * The operating room, the requirement of general degree of illumination is not lower than 1000Lux. The shadowless lamp took as the local lighting, should achieve above 20200Lux in the surgery table 30cm scope. May adjust the light to the auxiliary light source through the Tbus system intelligent controllers board or the remote control, may adjusts the light scope from 0% to 100%. According to different operating room illumination degree, specially the local lighting degree of illumination is different, May adjust the light source degree of illumination to carry on the pre establishment. Through illumination degree sensor established in the operating room, carry on the precise adjustment of illumination degree to some work surface. * Regards the functional checking room (mainly refer to ophthalmology department), its requirement of illumination degree reaches as high as7500Lux. Through the Tbus system intelligent controller board and the remote control, may adjust the light scope according to the hospital illumination standard request to the 50Lux scope。 In regards the mirror inspection room, X perspective room, the ophthalmology department darkroom and so on the degree of illumination is in the 50100Lux scope, may adjust the light to the Tbus system intelligent controller board and the remote control. * stalls the electric current and the leakage electric current examination module regarding the below important advanced equipment, like spiral CT, colored Doppler B ultra machine, the entire automatic blood congeals analyzer, the entire automatic chemistry lighting immunity analyzer, 24 hours dynamic electroencephalogram meter, straight vertical D53 machine, the central guardianship system and the breath machine and so on. Through the electric current and the leakage electric current examination to the equipment , early discovered equipment hidden danger, reported to the relative maintenance department before the equipment failure at an earlier time, reduced the life and property lose caused by the equipment failure, reduced the maintenance work load, strengthened the medical equipment security and reliability. * the surveillance of the medical equipment power supply and circuit breaker condition, any artificial or the breakdown trips will promptly feed back the system and recognize it, noticed to the service man. After the reserve power source starts, the system should provide the urgent light control function, only provides the power source to the urgent light return route in and prohibits normal light return route control. In the outpatient service consulting room, the treatment room, the rescue room, the small operating room, the gynecology and obstetrics department, infect ward, the tumor ward, the burn ward, the newborn room, the cardiovascular room and so on are equipped with the stationary installment ultraviolet ray sterilization lamp。24ghz_t-bus_eib智能化医院控制系统外文翻译(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。