服装英语和品质术语中英对照doc22-品质管理(编辑修改稿)内容摘要:

by poor color interlining matching. 紙朴顏色不配合 , 引致色差。 ACCESSORIES 輔料問題 1) Missing button / label / badge 漏鈕 / 漏嘜頭 / 漏章 2) Button position not well match buttonhole. 鈕與鈕門位置欠配合 3) Button inside out 鈕的底面倒置 4) Button marking not removed. 點鈕筆痕沒有清除 5) Damaged button/buttonhole 鈕爛 /爛鈕門 6) Rusted stud 工字鈕生銹 7) Paint peel off on stud 工字鈕顏色脫落 8) Button and buttonhole not aligned cause bulge. 鈕及鈕門位置不配合 , 引致谷起 9) Buttonhole too small to allow button to pass through. 鈕門太細 , 鈕不能順利通過 10) Uncut buttonhole / partially cut buttonhole 鈕門未幵 / 鈕門未開盡 11) Ragged edges at buttonhole 鈕門紗線不清 12) Broken buttonhole stitches 鈕門斷線 13) Button thread easily pulled out. 釘鈕線容易拉脫 14) Snap / rivet easily pulled 、撞鈕容易拉脫 15) Buttonhole is not match button size 鈕洞尺寸與鈕扣大小不相配 16) Button misplaced 鈕扣位置不對 17) Buttonhole misplaced 鈕洞位置不對 18) Button is not sewing security 鈕扣未釘牢 19) Button is sewn too tight 鈕扣釘得太緊 20) Buttonhole is fray 鈕洞有毛口 21) Key buttonhole density is too loose 鳳眼鈕洞的車縫線步太疏 22) Key buttonhole is misplaced 鳳眼鈕洞位置不對 23) Snap misplaced 揿鈕位置不對 24) Snap tape is misplaced 撳鈕扁帶位置不對 25) Snap tape setting not well 撳鈕扁帶裝得不好 26) There is bubble on buttonhole area 鈕洞周圍有氣泡 27) Hood and bar is misplaced 裙扣位置不對 28) Hole at zip top / end 拉鏈頂 / 尾有洞 29) Zipper setting is twisting 拉鏈裝得扭曲 30) Shoulder pad not attach to garment security 肩棉未釘牢 31) Shoulder pad not cover well 肩棉未包好 32) Velcro is misplaced 么 朮貼位置不對 33) Waistband belt is not set straight 腰耳裝得不直 34) Waistband belt length and width are uneven 腰耳的長、寬不一致 35) Inplete adhesive on interlining. 黏朴未完全黏好 36) Strike through of adhesive on interlining. 黏朴膠露面 37) Strike back of adhesive on interlining. 黏朴脫落 38) Blistering occurred on interlining. 黏朴起泡 39) Insecure shoulder pad attached. 肩棉釘縫不穩 40) Label placement incorrect. 嘜頭位置不正確 41) Care label content not as specified. 成份嘜內容不符合要求 42) Main label and size/content label are set too closed 主嘜與尺碼成份嘜裝得太靠近 43) Main label setting is misplace 釘主嘜不井齊 44) Wrong care label sewn on garment. 成份嘜車錯位置 (45) Label not properly secured. 嘜頭車縫不穩 (46) Label sewn beyond label edge. 嘜頭車縫太入 (47) Label sewing seam uneven / puckered. 嘜頭車縫不平均或起皺 48) Wrong accessories used. 用錯輔料 STITCHING AND SEAMS 線步和骨位 1) Raw edge 散口 2) Raw edges 爆口 3) Untrimmed thread ends 線頭未剪 4) Skipped stitches 跳線 5) Exposed stitching 露線 6) Broken stitches 斷線 7) Runoff stitches 間線落坑 8) Crooked stitches 線步彎曲 9) Poor join stitching 駁線欠佳 10) Unsightly overlapping stitches 駁線不良 11) Stitches too loose 線步太松 12) Stitches too tight 線步太緊 13) Distorted stitches 車線不直 15) Expose stitch 落 坑線外露 16) Inconsistent stitching 線步不一致 17) Uneven width on double stitching 雙線闊窄不均 18) Uneven stitching density / tension 線步密度 / 鬆緊度不平均 19) 1/4 top stitch not even 1/4 面線有寬窄 20)。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。