pfmeaintroduction(ppt16)(英文)-质量工具(编辑修改稿)内容摘要:
ted process failure modes. • Assesses the potential customer effects of the failures. • Identifies the potential manufacturing or assembly process causes and identifies process variables on which to focus controls for occurrence reduction or detection of the failure conditions. • Develops a ranked list of potential failure modes, thus establishing a priority system for corrective action considerations. • Documents the results of the manufacturing or assembly process. Philips Electronic Components (Shanghai) Co., Ltd. – AV Customer Defined The definition of “CUSTOMER” for a Process potential FMEA should normally be seen as the “END USER”. However, customer can also be a subsequent or downstream manufacturing or assembly operation, as well as a service operation. When fully implemented, the FMEA discipline requires a Process FMEA for all new parts/ processes, changed parts/ processes, and carryover parts/ processes in new applications or environments. It is initiated by an engineer from the responsible process engineering department. Philips Electronic Components (Shanghai) Co., Ltd. – AV Team Effort 1 During the initial Process potential FMEA process the responsible engineer is expected to directly and actively involve representatives from all affected areas. These areas should include, but are not limited to, design, assembly, manufacturing, materials, quality, service and suppliers, as well as the area responsible for the next assembly. The FMEA should be a catalyst to stimulate the interchange。pfmeaintroduction(ppt16)(英文)-质量工具(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。