mistake-proofing防误措施培训课件-中英文(ppt28)-管理培训(编辑修改稿)内容摘要:

ple of MistakeProofing the Design 防 误措施范例 设计 Before Improvement: 改进 前: Water needed to be measured for each pot of coffee often resulting in coffee that was too weak or too strong 泡前每壶咖啡的水量都要测量常常导致咖啡过淡或过浓。 13 Process Description: Making a pot of coffee 程序 描述:泡一壶咖啡 Example of MistakeProofing the Design 防 误措施范例 设计 After Improvement: 改进 后: Coffee maker was redesigned to measure and add the precise amount of water from a water bottle 重新 设计咖啡机以使每次从水瓶中加入的水的量都一样多 14 Process Description: A label is pasted into a recess in a molded chassis 程序 描述:将标签贴在底盘的凹槽内 Example of MistakeProofing the Design 防 误措施范例 设计 Before Improvement: 改进 前: The recess and the label were both rectangular. The label could be glued in upsidedown. 凹槽和标签都是长方形。 标签可能会贴反。 Recess in chassis 底盘的凹槽 Label 标 签 Model T6 AC 110V 10 W After Improvement: 改进 后: A notch was made in the corner of the label, and in the recess of the chassis. Incorrect mounting is pletely eliminated. 在 标签和凹槽的一角做一个切口。 就能完全防止错误发生。 Recess in chassis 底盘的凹槽 Label 标 签 Model T6 AC 110V 10 W 15 Example of MistakeProofing the Design 防 误措施范例 设计 Process Description: Install slides into a slide projector 程序 描述:将幻灯片装入幻灯机中 Before Improvement: 改进 前: Are some slides upside down? 有 一些幻灯片装反了吗。 After Improvement: 改进 后: Top edge of each slide marked with a red dot. 每 张幻灯片的上边都有一 红点。 16 Example of MistakeProofing the Design 防 误措施范例 设计 Process Description: Torquing a number of bolts recessed deep in a cavity. 程序 描述:将大量螺栓拧进空腔深处的凹槽内 Before Improvement: 改进 前: The socket extension required to reach the bolts caused nicks and scratches in the painted surfaces that it contacted during assembly. 在操作的过程中,用来拧螺栓的拧杆柄会对油漆表面造成刮伤。 After Improvement: 改进 后: A rubber hose was installed over the socket extension and was specified on the work instructions. 一 个橡皮管被装在拧杆柄上并在工作说明书上有详细说明。 17 MistakeProofing is a way of using wisdom and ingenuity to create devices that ensure a task is always done correctly. 防 误措施是指运用智慧和独创性发展出一个能确保任务总是能正确完成的 设备 的方法。 MistakeProofing isn’t Words! 防 误措施不是 文字。 Word “Solution” 文字 “解决方法” Problem:The “One Day “ employee badge form asks for badge and clock . Employees often write their clock in the badge spot。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。