上海船厂英语实用手册手册(编辑修改稿)内容摘要:
Fuel Oil Supply Pump of Purifier 12)分油机供给泵 Sea Water Pump of Fresh Water Generator 13)制淡海水泵 Ballast Pump 14)压载泵 Bilge and Fire Pump 15)舱底消防泵 Bilge Water Pump 16)舱底水泵 Sludge Oil Pump 17)油渣泵 Diesel Oil Transport Pump 18)柴油输送泵 Fuel Oil Transport Pump 19)燃油输送泵 Cylinder Oil Transport Pump 20)汽缸油输送泵 Fresh Water Transport Pump 21)淡水输送泵 第 34 页 Hot Water circulating Pump 22)热水循环泵 Drinking Water Pump 23)饮水日用泵 Bilge, Fire and Pump 舱底消防总用泵 Sprinkling Pump 喷淋泵 Heeling Pump 横倾泵 Harbor Sea Water Pump 停泊海水泵 All kinds of tank 二、各种舱(箱)柜 Diesel Oil Daily Tank 柴油日用柜 Diesel Oil Setting Tank 柴油澄清舱 Fuel Oil daily Tank 燃油日用柜 Fuel Oil Setting Tank 燃油澄清舱 Lubricating Oil Setting Tank 滑油澄清舱 Lubricating Oil Store Tank 滑油储藏舱 Lubricating Oil Circulating Tank 滑油循环舱 第 35 页 Fuel Oil Overflow Tank 燃油溢油舱 Fuel Oil Sludge Tank 燃油油渣舱 Fuel Oil deep Tank 燃油泵舱 Lubricating dirty Oil Tank 1滑油污油舱 Lubricating Oil Overflow Tank 1滑油溢油舱 Lubricating Oil Sludge Tank 1滑油油渣舱 Fresh Water Expaning Tank 1主机淡水膨胀水箱 Fresh Water Expaning Tank 1付机淡水膨胀水箱 Fresh Water Pressure Tank 1淡水压力柜 Hot Water Pressure Tank 1热水压力柜 Drinking Water Pressure Tank 1饮水压力柜 Fresh Water Tank 1淡水舱 Drinking Water Tank 饮水舱 Boiler Water Tank 2锅炉水舱 Purify Operating Water Tank 2分油机工作水箱 第 36 页 Cylinder Oil Daily Tank 2汽缸油日用柜 Gravity tank of Tube Oil 2尾管滑油重力柜 Exhaust Seal Water Tank 2排气水封箱 Distilling Water Tank 2蒸馏水舱 Bilge Well 2污水井 All kinds of pipes 三、各种管系系统 Lubricating Oil Piping System 滑油系 统 Fuel Oil Piping System 燃油系统 Sea Water Piping System 海水系统 Cylinder Cooling Water Piping System 缸套水系统 Start Air Piping System 启动空气系统 Control Air Piping System 控制空气系统 Exhaust Piping System 排气系统 Daily Water Piping System 日用供水系统 第 37 页 Steam Piping System 蒸汽系统 Feed Water and Condensate of Boiler Piping System 锅炉给水和凝水系统 Fuel Oil Purified Piping System 1燃油净油系统 Fuel Oil Transport Piping System 1燃油输送系统 Lubricating Oil Purified Piping System 1滑油净油系统 Lubricating Oil Transport Piping System 1滑油输送系统 Ballast and Bilge Water Piping System 1舱底压载系统 Instructions 四、仪表类 Pressure gauge 压力表 Vacuum gauge 真空表 Thermometer 温度计 DWT gauge 吨位表 Distant survey gauge 遥测表 第 38 页 Level switch 液位器 Sensor 传感器 Others 五、其它 Fan 风机 AntiFoul STM Plant 防海生物装置 Air Foam Tank 泡沫柜 Middle Shaft 中间轴 Propeller Shaft 尾轴 Propeller 螺旋桨 Steady Bearing 中间轴承 Foam Fire Extinguisher 泡沫灭火机 Sterilizer plant 饮水消毒装置 Main Switch Board 主配电板 Engine Room Control Console 1机舱集空台 第 39 页 Engine Control Room 1集空室 Vise(=Vice) 1台虎钳 Bronze Close Valve 1青铜截止阀 Bronze Check Valve 1青铜截止止回阀 Cast iron Stop Valve 1铸铁截止阀 Cast iron Check and Stop Valve 1铸铁截止止回阀 Adjustable valve 1调节阀 Relief valve 1溢流阀、安全阀 Reducing valve 减压阀 Material 六、材料 Pipe 管子 Seamless Steel Pipe (Tube) 无缝钢管 Purple Copper Pipe 紫铜管 Iron Flange 铁法兰 第 40 页 Copper Flange 铜法兰 Blind –Flange 盲板法兰 Bolt 螺丝(螺栓) Stud 双头螺丝 Nut 螺帽(螺母) Stainless Steel Bolt 不锈钢螺丝 Gasket 1垫片(床) Gum Gasket 1橡皮 床 Paper Foil Gasket 1纸箔床 Purple Copper Gasket 1紫铜床 Black Lead Gasket 1石墨床 Black Lead Gasket 1青铅床 Feeler gauge 1佛纳 Clamp 1支架(马脚) Paint 1油漆 第 41 页 Spare Parts 备件 Produce tool 七、生产工具 Drawing 图纸 Adjustable Spanner 活络板 Ring Spanner 令司板(梅花板) Openender Spanner 开口板 Pipe Wrench 管子钳 Chisel 凿子 Hammer 锒头 File 锉刀 Screwdriver 螺丝刀 Paint roller 油漆滚筒 Paint brush 1油漆刷子 Hacksaw 1钢锯 第 42 页 Socket spanner 1套筒扳手 Torch 1手电筒 Driller 1钻头 八、英语会话 Good morning. 早上好。 Today we will test the oilywater separator. 今天我们准备交验油水分离器。 Please follow me. 请跟我来。 Please check the condition of installation and insulation, first. 首先请检查安装说明和电器绝缘。 Now we will run the oilywater separator. 我们准备将油水分离器运转。 第 43 页 Please check the running condition. 请检查运转情况。 Now we will do the function test about alarm and safety device one by one. 接着我们准备一个一个地做报警 /安全保护装置的功能试验。 Now the test is over. 设备交验基本结束。 Do you have any question? 请问有何修改意见。 Thanks. 非常感谢。 Good bye. 1再见。 Please tighten/release the flange. 1请把这对法兰撬紧 /松开。 The piping is from to the G/E unit. 第 44 页 1这路管子是从发电机单元来。 This flange/connection is linking. 1这对法兰 /接头在漏。 The test pressure of the piping system is 7 bar. 1这路系统的试验压力是 7公斤。 Please make a clamp here. 1 这里请加强。 Add a drain plug here. 1这里增加一只落水抖。 Please dry it by the pressed air. 1请用压缩空气吹干。 I will e to my workshop to take some soap water. 1我将回车间去拿肥皂水。 This system is very important, please checks it carefully. 这个系统是非常重要的,一定要认真检查。 第 45 页 Please check your remarks. 2请交验修整意见。 It’s too hot, please take a rest. 2天太热了,请休息一会了。 I am in charge of this job. 2我负责这项工作。 ELECTRIC PART 电气部分 Words and expression 一、常用词汇 2182 KHz watch receiver 2182千赫值班收信机 abnormal 异常 acknowledge 应答 active power 有功功率 actuator 执行器 adjust 调整 第 46 页 air circuit breaker (ACB) 空气断路器 Alarm system 报警系统 alternating current (AC) 交流电 ammeter 电流表 amplifier 放大器 analog(ue) 模拟 anchor light 锚灯 anemometer amp。 anemoscope 风速风向仪 anode 阳极 antenna 天线 antenna feeder connector 天线馈线连接器 antenna leadingin insulator 天线引入绝缘端子 antenna multicoupler 天线共用器 antenna tuner 天线调谐器 arc welder 电焊机 第 47 页 audible 声音的 Auto chart plotter 自动海图标绘仪 Auto pilot 自动舵 automatic 自动的 automatic radar plotting aid (ARPA) 自动雷达标绘仪 Automatic telephone 自动电话 automatic voltage regulator (AVR) 电压自动调节器 Automation system 自动化系统 ballast control console 压载控制台 balla。上海船厂英语实用手册手册(编辑修改稿)
相关推荐
该信号机是( B )。 A 道岔防护信号机 B 阻挡信号机 C 出站信号机 D 复示信号机 ( A )提示驾驶员关门。 A 白色闪光 B 无显示 C 稳定白色 灯光 D 点亮 1 次 ( A)道岔防护信号机,无岔站以安全线尽头出作为车站与区间的分界。 :一个红色信号和一个月白色闪光表示 (A)。 A.引导信号 ( C )过渡。 A 园曲线 B 曲线 C 缓和曲线 D 竖曲线
( 1) 10kV 高压电力电缆 型式 交联聚乙烯绝缘钢带铠装聚氯乙烯护套铜芯电缆 电压 型号 ZRCYJV22 截面 3 35mm2 配冷缩电缆终端头 (户内型) 及其成套附件 适用于 YJV223x35 mm2 电力电缆 ( 2) 1kV 低压电缆 型式 交联聚乙烯绝缘钢带铠装聚氯乙烯护套铜芯电缆 电压 柬埔寨 额勒赛下游水电站上电站 大坝工程 ( 合同编号: ) 技术投标
直度和磨盘的水平。 因该地层有较厚的淤泥质粉质粘土,应做好泥浆护壁工作,防止桩身塌孔和缩颈现象。 钻头进入界面和终孔,必须捞取岩样与原始样比较,并经监理工程师确认后封袋保存。 ~,~,并经试桩后调整,二次清孔时间均应大于30分钟以上。 钢筋笼制作优先采用闪光对接焊,加劲箍和主筋必须采用点焊,箍筋和主筋同一截面点焊不得少于3个,孔口对接采用单面焊,焊缝长度10d0,需有专职焊工进行操作。
结合生态园所 处地区的文化与人文景观,开发出具有当地农业和文化特色的农副产品和旅游精品,服务社会。 培植精品,营造主题形象 基于观光农业生态园缺乏拳头产品,难以深度开发的现状,生态园规划应以生态农业模式作为园区农业生产的整体布局方式,培植具有生命力的生态旅游型观光农业精品。 另外,要发挥生态园已有的生产优势,采用有机农业栽培和种植模式进行无公害蔬菜的生产,体现农业高科技的应用前景,形成产品特色
楼盘, 5500 元以上的楼盘普遍难以承受。 他们希望房价稳定并等待着下降。 购得起高价房、豪宅的毕竟还是小部分,大约占15%左右。 再次,股市行李萧萧的个人主页 需要文档请给我留言。 情的走好,相对地吸引了部分资金。 当然也会有部分股民等待股市解套后,抽回资金去买房。 综上所述,由于在可预见的阶段内,没有影响上海市房价必涨或必跌的确定因素 ,因此我们预测上海未来 半年到一年
工程车道 新建粉煤灰三渣基层设计厚度为 40cm,三渣分二层摊铺碾压,下层摊铺厚度为 25cm,采用推土机 (或挖机 )摊铺;面层摊铺厚度为 15cm,采用沥青摊铺机摊铺,上下层横向接缝间距需错开 1m 以上,下层施工完毕后尽早进行面层的施工,面层施工前对下层顶面要打扫干净,并洒水湿润。 A、 材料:三渣采用厂拌供料,要求石料采用 540 粒径的石子,即采用小粒径三 16 渣