wzr无刷自控电机软起动器说明及介绍(编辑修改稿)内容摘要:

with starting current. increasing the motor torque when reducing the current. adopting brushless running, it is 10 times to save the power and starting , the price is not reached 1/3 than other softstarter. The starting resistance is directly installed the rotoring shaft of motor, using the centrifugal power as driving, control the starting resistance to reduce the starting current, increase torque、 equipping the no brush self controlled motor to winding asynchronous motor. In order to prolong the using life, adopting the starting liquid to resisting rust、 deteroprate、 freeze、boiling(boiling point is120℃ ). To guarantee running safety, it needs to set the safey exhausting valve, which will be opened automatically when reaching the rated speed.  适用范围 电源电压:三相 50Hz 380V10KV 适用电机:三相绕线式异步电动机 起动频度:每小时不超过 10次 海拔高度:不超过 2020M 环境温度:最低气温 25℃ ,最高气温 +40℃ 无易燃、易爆、无严重腐蚀性气体的场所  AREAS OF APPLICATION Power Voltage: three phase 50Hz 380V10KV Adapting Motor: thress phase winding asynchronous motor Frequency of Starting: less than 10times per hour Height of Elevation: less than 2020m Tempreture of environment: the Lowest: 25℃ , the Highest: +40℃ the place of no bustible、 explosive、 caustic gas  主要技术参数 额定电压: 380V、 6KV、 10KV,配用电机功率: 1302020KW。 起动特性: : MI1Ie、 5s≤T≤15s : 1MeMI、 5s≤T≤15s : M 电机实现恒转矩、恒电流起动,起动电流、起动转矩可根据用户要求方便、连续地无级调整。 实现绕线式电动机无刷运行,彻底根除使用滑环、碳刷所造成的各种危害,节省了起动控制柜及二次电缆,使绕线式电机起动装置的成本降低 70%,运行维护工作量减少 90%,电机及其控制装置的可靠性提高一倍以上。  MAIN TECHNICAL PARAMETER Rated Voltage: 380V、 6kV、 10kVAda。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。