techgridcg2000天花龙骨系统的材料及安装说明(编辑修改稿)内容摘要:

not hitting the structure / slab rebar. Install the approved anchor bolt and M10 galvanized threaded steel rod drop and square hanger to the total length needed for the ceiling height as per designed. 需再次确认孔有足够的深度而且没有击中钢筋等物。 装入合格的顶爆螺丝和M10的丝杆后,装上方形调节器直到所需要的吊顶设计高度。 Step 5: 第五步: Open up the ceiling tee packing, take out the ceiling tee and cross connector. Using hand drill and M8*25 allen key screw to fixed the cross connector and ceiling tee. Installation on ground only allowed for main grid. To fixed L= main grid. All installed main grid to put on another place and ensure surface of ceiling tee without any scratched. 打开天花龙骨的包装箱,取出龙骨和十字连接件,在其中一片场地上用带M6 六角批头的手枪钻将 M8 X 25 的内六角螺栓把十字连接件和龙骨连接起来,拼成一个 L= 的 天花 主 龙骨,放在另外一片场地上。 地面安装只允许 组 装 主 龙 骨。 操作过程中要避免铝合金表面被刮伤。 XXXX 系 统 建 材 有 限 公 司 XXXX SYSTEMS CO. LTD. 5 Step 6:第六步: If storage area not enough to keep installed ceiling grid, there are allowed to multilayer keep the ceiling grid. But to ensure surface not scratch during storage, every single layer ceiling grid should fence out with plastic sheet. Maximum multilayer storage is 10 layers to make sure safety. 如果场地不够,可以将 组装好 的 天花龙骨叠放。 但注意不要将表面划伤。 每层之间用塑料膜隔开。 叠放 不可太高,最多可以叠放十层。 Step 7:第七步: At the same time, during finished 1st set main grid installation. Find out Intersection of vertical and。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。