gwd数学考试复习资料(编辑修改稿)内容摘要:
Q24: If w and c are integers, is w 0? (1) w + c 50 (2) c 48 A. Statement (1) ALONE is sufficient, but statement (2) alone is not sufficient. B. Statement (2) ALONE is sufficient, but statement (1) alone is not sufficient. C. BOTH statements TOGETHER are sufficient, but NEITHER statement ALONE is sufficient. D. EACH statement ALONE is sufficient. E. Statements (1) and (2) TOGETHER are NOT sufficient. Answer: Q25: A photographer will arrange 6 people of 6 different heights for photograph by placing them in two rows of three so that each person in the first row is standing in front of someone in the second row. The heights of the people within each row must increase from left to right, and each person in the second row must be taller than the person standing in front of him or her. How many such arrangements of the 6 people are possible? A. 5 B. 6 C. 9 D. 24 E. 36 Answer: Q26: Running at their respective constant rates, machine X takes 2 days longer to produce w widgets than machine Y. At these rates, if the two machines together produce 5/4 w widgets in 3 days, how many days would it take machine X alone to produce 2w widgets? A. 4 B. 6 C. 8 D. 10 E. 12 Answer: Q27: If n = 811 – 8, what is the units digit of n? 7 A. 0 B. 1 C. 4 D. 6 E. 8 Answer: Q28: For any positive integer n, the sum of the first n positive integers equals [n(n+1)]/2. What is the sum of all the even integers between 99 and 301? A. 10,100 B. 20,200 C. 22,650 D. 40,200 E. 45,150 Answer: Q29: June 25, 1982, fell on a Friday. On which day of the week did June 25, 1987, fall? (Note: 1984 was a leap year.) A. Sunday B. Monday C. Tuesday D. Wednesday E. Thursday Answer: Q30: Joanna bought only $ stamps and $ stamps. How many $ stamps did she buy? (1) She bought $ worth of stamps. (2) She bought an equal number of $ stamps and $ stamps. A. Statement (1) ALONE is sufficient, but statement (2) alone is not sufficient. B. Statement (2) ALONE is sufficient, but statement (1) alone is not sufficient. C. BOTH statements TOGETHER are sufficient, but NEITHER statement ALONE is sufficient. D. EACH statement ALONE is sufficient. E. Statements (1) and (2) TOGETHER are NOT sufficient. Answer: Q31: A positive integer n is said to be “primesaturated” if the product of all the different positive prime factors of n is less than the square root of n. What is the greatest twodigit primesaturated integer? A. 99 B. 98 C. 97 D. 96 E. 95 Answer: Q32: For a convention, a hotel charges a daily room rate of $120 for 1 person and x dollars for each additional person. What is the charge for each additional person? 8 (1) The daily cost per person for 4 people sharing the cost of a room equally is $45. (2) The daily cost per person for 2 people sharing the cost of a room equally is $25 more than the corresponding cost for 4 people. A. Statement (1) ALONE is sufficient, but statement (2) alone is not sufficient. B. Statement (2) ALONE is sufficient, but statement (1) alone is not sufficient. C. BOTH statements TOGETHER are sufficient, but NEITHER statement ALONE is sufficient. D. EACH statement ALONE is sufficient. E. Statements (1) and (2) TOGETHER are NOT sufficient. Answer: Q33: Is xy x/y? (1) xy 0 (2) y 0 A. Statement (1) ALONE is sufficient, but statement (2) alone is not sufficient. B. Statement (2) ALONE is sufficient, but statement (1) alone is not sufficient. C. BOTH statements TOGETHER are sufficient, but NEITHER statement ALONE is sufficient. D. EACH statement ALONE is sufficient. E. Statements (1) and (2) TOGETHER are NOT sufficient. Answer: Q34: The function f is defined by f(x) = 1/x for all nonzero numbers x. If f(a) = 1/2 and f(ab) = 1/6, then b = A. 3 B. 1/3 C. 1/3 D. 3 E. –12 Answer: Q35: What is the median number of employees assigned per project for the projects at Company Z? (1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project. (2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project. A. Statement (1) ALONE is sufficient, but statement (2) alone is not sufficient. B. Statement (2) ALONE is sufficient, but statement (1) alone is not sufficient. C. BOTH statements TOGETHER are sufficient, but NEITHER statement ALONE is sufficient. D. EACH statement ALONE is sufficient. E. Statements (1) and (2) TOGETHER are NOT sufficient. Answer:。gwd数学考试复习资料(编辑修改稿)
相关推荐
直 到 90 年代初我国 HACCP 系统才真正得到普及和应 用。 目前,六类食品必须建立 HACCP 的生产出口食品的企业有:生产水产品、肉及肉制品、速冻蔬菜、果蔬汁。 含肉或水产品的速冻食品、罐头类产品企业 [4]。 近年来 ,国际食品企业用于危害分析和控制的范围及研究领域更为扩大 ,HACCP 被广泛用于鱼、肉、奶及其制品等的生产和销售中 ,有效地控制了细菌及其毒素、病毒
the beginning of 2020: Number of tons withdrawn in 2020 100,000 Estimated recoverable tons as of the end of 2020 950,000 Total recoverable tons as of the beginning of 2020 1,050,000 Change in
AID功能的驱动文件) “海存” HC9200 系列阵列产品用户使用中文手册 单击完成后 ,接着会继续弹出找到 新硬件 ,按提示进行选择安装。 安装完成后 ,新的 SATA 设备已可被正常使用,您可以在系统的设备管理器里找到新的 SATA装置。 Windows 2020 下移除 HCPE200 在 Windows2020 下移除 HCPE200, 必须在设备管理器中将 SCSI 和 RAID
出 是最终结果其本身 具体行为 是任职者大部分时间做的事 是任职者的输入 是达成最终结果的手段 H a y G r o u p 18 期望的最终结果 主要活动 制定信息服务计划 通过了解组织的业务需求,同时与信息技 术研发保持同步 提供硬件设备 通过预测硬件能力需求及在设备安装方面 指导下属 提供软件解决方案 通过与直线经理召开会议以了解他们及直 线下属在软件解决方案设计方面的需求。
(4)压井管线至少有一条在盛行风的上风方向,以便必要时放置其它设备; (5)井控装置和管材在使用前应进行无损探伤,不允许有微小裂纹存在。 (二)合理选择管材 1.钢材。 由于钢材的强度越大,对硫化氢应力腐蚀开裂越敏感。 因而要求钢的屈服极限不得大于 655002KPa,硬度最大为 HRC22。 若钢材经调质处理,其屈服极限和硬度可以比上述规格略高。 2.非金属材料。 凡密封件选用的非金属材料
凝土。 机房填充墙:待框架梁桩强度达到要求后方可拆模做 11 填充墙。 其余围墙、地面、屋面等部位做法及要求均同其它机站。 二、 施工大纲 ( 一 ) 、 钢筋、混凝土工程 钢筋的实际长度应根据现场的实际情况尺量确定后下料,实际长度应得到建设单位或监理单位的认可; 基础工程采用的钢筋应有合格证和复试单。 ( 二 ) 、钢筋混凝土梁板基础 由于本工程为框架结构