站内露空管道系统安装方案(编辑修改稿)内容摘要:
0000222 Technical Specification for Insulation of Pipeline and Storage Tank 《现场物资质量控制管理办法》 CDB0000QACPCDSC20000003900 Implementation of Onsite Material Quality Control 《移动式起重机吊装作业安全管理标准》 CDB0000HESPCDSC20000001500 Safety Management Standard for Hoisting Operation with Mobile Crane HSE 培训标准 CDB0000HESPCDSC20000000200 HES Training Standard 《个人防护用品管理标准》 CDB0000HESPCDSC20000000800 Management Standard for Individual Protective Article 《工具箱会议标准》 CDB0000HESPCDSC20000000900 Standard for Toolbox Meeting 雪佛龙 《作业许可管理标准》 Chevron’s Management Standard for Work Permit 《设备管理办法(试行)》 CDB0000HESPCDSC20000002100 Equipment Management Method (Pilot Edition) 《事故管理程序》 CDB0000HESPCDSC20000001400 Accident Management Procedure 《质量检验计划》 CDB0000QACPCDSC20000003200 Quality Inspection Plan . 相关设计文件 及规范 Related Design Documents and Specifications 有效版本施工图、说明书和 CDB 重要 的设计文件。 Effective construction drawings, specifications and CDB important design documents. 《 石油天然气建设工程施工质量验收规范 站内工艺管道工程 》 ( SY42032020) Code for quality acceptance of oil and gas construction engineering Station procedure pipeline project ( SY42032020) 《石油天然 气站内工艺管道工程施工及验收规范》 ( SY04022020) Standard for Construction and Acceptance of Oil and Natural Gas Station Procedure Pipeline Project SY04022020 《石油天然气站内工艺管道工程施工规范》 ( GB505402020) Code for Construction of Pipe Process in Oil and Gas Transmission Pipeline Station ( GB505402020) 《高酸性气田集输站场及净化装置设备与管道安装工程施工及验收规范》 QSY XN20202020 Code for Construction and Acceptance of Gathering Transportation Facilities, Purification Unit Equipments and Pipeline Installation of Highsour Gas Field Project QSY XN20202020 《高酸性气 田集输场站和净化装置工程质量验收标准》 QSY XN20202020 Standard for Quality Acceptance of Gathering Transportation Facilities and Purification Unit Engineering Project of Highsour Gas Field QSY XN20202020 《给排水管道工程施工及验收规范》 ( GB502682020) Code for Construction and Acceptance of Water Supply Pipelines GB502682020 《现场设备、工业管道焊接工程施工及验收规范》( GB5023698) Code for Construction and Acceptance of Field Equipment, Industrial Pipe Welding Engineering GB5023698. 《工业金属管道工程施工及验收规范》( GB502352020) Code for Construction and Acceptance of Industrial Metallic Piping GB502352020. 《工业设备及管道绝热工程施工规范》 ( GB501262020) Code for construction of industrial equipment and pipeline insulation engineering GB501262020 3. 健康、安全与环境 HEALTH, SAFETY amp。 ENVIRONMENT . 风险评估 Risk Assessment 此方案风险 分析详见附件 1。 See to attachment 1 for risk analysis. 站内露空管道系统安装方案 Method Statement for Installation of Exposed Pipeline in Well Pad and Gathering Station 3 此方案中的所有单项工作都应与承包商的单项 JSA,风险分析和每天开始工作前进行的工具箱会议相符。 All individual tasks mentioned in this method statement will be subject to individual JSA, risk assessments and toolbox talks by CONTRACTOR InSitu before work mences on a daily basis. . HSE要求 HSE Requirements 作业前应根据作业内容办理相关许可,如综合作业许可、热工作业许可、受限空间作业许可、射线作业许可、开挖作业许可等。 Handle relevant PTW before work mence, such as general work permit, hot work permit, work permit for work in confined space, work permit for ray operation, excavation work permit, etc.. 不锈钢焊接时,应做好预防六价铬的呼吸道防护(若需要)。 When perform stainless steel, make proper respiration protection against chromium VI (if required). 所有人员都应参加了适应的安全培训并佩戴 PPE,如作为最低要求的安全帽,钢头鞋,安全眼镜和工作服以及根据具体情况需要穿戴的安全手套、高亮背心以及面罩等。 All personnel participating will take appropriate safety training and properly wear PPE as minimum requirements as hard helmet, steel toe boots, safety glasses and coverall. Safety gloves, high visibility vest and facial shield will be required for specific works. 起重作业应根据项目《安全工作规范手册》第 条之规 定,制定起重计划。 起重吊装作业应当根据现场的实际情况考虑吊车、运输车辆的站位以及是否影响道路交通安全。 Lift plan will be prepared in accordance with Sec. in Safe Work Specification Manual. Lift operation should consider whether the standing position of cranes and transportation vehicles will impact traffic safety based on site condition. 动火作业点设监护人、配备消防器材、设置遮挡电焊弧光措施、周围无易燃易爆物品。 禁止在下雨露天进行焊接作业。 Watch men will be set at hot work locations, as well as firefighting equipments. Certain measures will be taken to sheld welding arc. Surrounding should free from explosive and bustibles. No open welding operation in rainy day. 脚手架 /平台的搭拆必须由取得搭设资格的人员进行施工。 脚手架 /平台搭设完毕经检查验收,挂牌后才能使用。 Erection and dismantlement of scaffold/ platform should be worked by petent personnel. The scaffold can not be used unless it is inspected, accepted and tagged after erection. 高处作业点设监护人,工作人员必须穿戴全身式安全带并坚持高挂低用的原则,工作区域和安全带系挂点需在作业前检查确认。 Forman will be assign for work at height. Workers must wear full body harness and keep the principle of hanghigh use low being followed. Work zone and body harness hanging points should be checked and confirmed before operation. 临时用电安全措施,配电箱布置。 安排专人负责管理(持证电工)发电机、配电箱等,并有日检查记录。 Safety measures for temporary power use and arrangement of distribution box. Assign people (certified electrician) to manage the generator and distribution boxes, etc. and have daily inspection records. 工作场所应设置警示、标识牌,必要时设置硬维护以防止擅自入内。 Warning sign, tag board will be set up at work area。 hard barricade maybe required when it is necessary to avoid accessing into it without permit. 作业现场必须按照每 ―50名作 业人员: 1名安全员的比例进行配备,以保证现场人员、物资的安全。 Provide safety officer in a proportion of ―50 workers: 1 safety officer‖ on worksite to ensure safety of personnel and material. 作业过程中,每名员工有权利且有义务对不安全行为 ―叫停 ‖。 During working, every employee has right and responsibility to ―STOP‖ the unsafe behaviors. 现场文明施工管理,需要规划临时设施、管道堆放地点并有序摆放。 House keeping on site. Make plan for temporary facilities and pipe laydown area and make sure they are placed orderly. 作业现场非指定区域禁止吸烟,现场设置吸烟点。 No smokin。站内露空管道系统安装方案(编辑修改稿)
相关推荐
其内部消耗远远不足以让自 己“吃饱”,“三星在中国的彩管年产上千万条,而三星中国的需求只有几十万条”,而 LG 彩电前端器件公司为 LG 飞利浦,鉴于投资主体的不同, LG 同样采取的是开放的市场策略。 因而在行业人士看来,在这个开放体系的生物链条中,处于链条下游的中国企业已不再吃亏,因为数字显示的核心技术几乎等于“公用技术”,所有下游终端厂家都处于公平的起跑线
(三)信汇业务的特点 三、票汇 (一)票汇的业务程序 汇款人 /债务人 3银行即期汇票 收款人 /债权人 1 汇票申请书交款付费 2 银行即期汇票 汇出行 4汇票通知书 7付讫结汇通知书 5 银行即期汇票 6 解付汇款 汇入行 图 45 票汇业务程序图 (二)票汇实例 (三)票汇业务的特点 四、三种汇款方式的区别与联系 表 41 三种汇款方式的区别 项目 方式 银行占用客户资金 成本 速度
秀生中选 1人 , 从剩下的 8名非优秀生中选 4名 , 共有 种方法;最后剩下的 1名优秀生和 4名非优秀生给丙班 , 有 种方法 , 将 15名新生平均分到甲 、 乙 、 丙三个班级共有 种不同的分法 . • 所以每班各分配到一名优秀生的概率为 • . 143 12CC1428CC1414CC5 5 51 5 1 0 5C C C1 4 1 4 1 43 1 2 2 8 1 45 5 51
和通风设备。 此外,与传统停车场相比,车辆一进智能车库就熄火,由机械设备自动存放,减少了车辆在车库内的迂行和尾气排放,还有利于环保节能。 基于种种优点,在寸土寸金的城市,发展容量大、占地少、利用效率高的立体停车库就成为解决城市停车难的必然出路,而用地更紧张的住宅小区、商场、医院、政府及企事业单位等,对机械立体停车库的需求更为迫切。 政府工程、房地产配套、家庭停车需求首选
─┘ └────┘ 第四章 主要工种施工方法 一、施工前期工作 本工程专业种类较多,因此在施工前,参加本工程的施工人员应学习好设计施工图,并参看有关专业图纸和要求,核对各专业及本专业安装的座标,标高有否交叉、相碰撞及排列所用空间是否合理。 发现问题应及时与设计、建设监理单位或建设单位等有关人员研究解决,并做好变更洽商记录手续。 安装施工前应对工程所使用的材料、设备、部件、成品
工顺序及进度安排 根据现场施工条件,拟定 立柱 施工顺序及安 排如下: 立柱 首件位于主线高架 Pm130墩 左幅 ;其计划施工时间为 12 月 16 日。 立柱计划 2020 年 12 月 16 日开始施工, 2020 年 08 月 04 日完成 4 施工方案及工艺 工艺流程 承 台 砼 浇 筑墩 身 钢 筋 进 场 、验 收墩 身 钢 筋 笼 整 体吊 装 预 埋墩 身 模 板 安 装墩 身