宝山区20xx学年第一学期期末考试九年级英语试卷录音文字及答案(编辑修改稿)内容摘要:

summer? W: Sure. I’ll never fet it. M: Me too. It has affected million people. About 180 people were killed and 52 are still missing. It caused about billion yuan in damage. It is the worst flood in the 2020 学年第一学期期末考试九年级英语 试卷 第 3 页 共 8 页 past ten years in China. Q: How much in damage did the flood cause? (D) C. Listen to the passage and tell whether the following statements are true or false (判断下列句子是否符合你听到的短文内容 , 符合的用“ T”表示,不符合的用“ F”表示 ): (7 分 ) We can’t stop an earthquake, but we can do things to make sure that earthquakes don’t destroy whole cities. First, it is not a good idea to build houses along lines where two of the earth’s plates join together. Second, if you think there may be an earthquake, it is better to build houses on rocks , not on sand. Third, you must make the houses as strong as possible. Weak buildings will fall down in an earthquake, but strong ones may stay up. Scientists are afraid that one day an even bigger earthquake will hit the part around San Francisco. They call it “The Big One”. However, people today are still building more houses. The population in and around San Francisco is now ten times more than it was in 1906. This means that if there is another earthquake, a great many houses and buildings will be destroyed. 17. F 18. T 19. T 20. T 21. T 22. F D. Listen to the passage and fill in the blanks (听短文填空,完成下列句子。 每空格限填一词 ): (7 分 ) Can you make some things that make you think of China. How many can you list? You may say tea, fireworks and so on, but don’t fet por。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。