20xx年普通高等学校招生全国统一考试英语江苏卷英语word版及答案(编辑修改稿)内容摘要:

ternal clock of human bodies C. should be well managed for our own interest D. should be saved for outside interests 58. In the next part, the author would most probably discuss ith you _______. A. how to keep up with the times B. how to make up for lost time C. how to have a good time D. how to make good use of time B We experience different forms of the Sun‟s energy every day. We can see its light and feel its warmth. The Sun is the major source of energy for our pla. It causes the evaporation(蒸发) of wather from the oceans and lakes. Sunlihgt also provides the energy used by green plants to make their own food. These green plants then provide food for all anisms(生物) on the Earth. Much of the energy that es from the Sun never reaches the Earth‟s surface. It is either reflected or absorbed by the gases in the upper atmosphere. Of the energy that reaches the lower atmosphere, 30% is reflected by clouds or the Earth‟s surface. The remaining 70% warms the surface of the pla, causes water to evaporate, and provides energy for the water cycle and weather. Only a tiny part, approximately %, is actually used by green plants to produce food. Many gases found in the atmosphere actually reflect heat energy escaping from the Earth‟s surface back to the Earth. These gases act like the glass of greenhouse in that they allow energy from the Sun to enter but prevent energy from leaving. They are therefore called greenhouse sunlight strikes an object, some of the energy is absorbed and some is reflected. The amount reflected depends on the surface. For example, you‟ve probable noticed how bright snow is when sunlight falls on it. Snow reflects most of the energy from the Sun, so it contrbutes to the low temperatures of winter. Darkcoloured surfaces, such as dark soil or forest, absorb more energy and help warm the surrounding air. 59. According to the passage, the root cause for weather changes on the Earth is _________. A. the atmosphere surrounding the Earth B. water from oceans and lakes C. energy from the Sun D. greenhouse gases in the sky 60. Only a small part of the Sun‟s energy reaches the Earth‟s surface because most of it is ________. A. absorbed by the clouds in the lower atmosphere B. reflected by the gases in the upper atmosphere C. lost in the upper and lower atmosphere D. used to evaporate water from the oceans and lakes 61. We learn from the passage that _______. A. all living things on the Earth depend on the Sun for their food. B. a forest looks dark in winter because it absorbs solar energy. C. only % of the energy from the Sun is made use of on the Earth. D. greenhouse gases allow heat energy to escape from the Earth‟s surface. C Gallery For Visitors to National Gallery of Art, Washiongton Visitors must present all carried items for inspection upon entry. After inspection all bags,backpacks, umbrellas, parcels, and other things as determined by security officers must be left at the checkrooms, free of charge,close to each entrance. All oversized bags, backpacks, and luggage must be left at the checkrooms near the 4th Street intrance of either the East or West Building. These items will have to be xrayed before being accepted. Items of value, such as laptop puters, cameras, and fur coats, may not be left in the checkrooms but may be carried into the galleries. We regret that we do not have enough space for visitor items larger than 17*26 inches into the Gallery or its checkrooms. Additional security procedures and checks may be taken accoding to the decision of the Gallery. For the safety of the artworks and other visitors, nothing may be carried on a visitor‟s back. Sofft front baby carriers are allowed, but children may not be carried of shoulders or in a child carrier worn on the back. Pushchairs are available free of charge near each checkroom Smoking is prohibited. Food and drink are not permitted outside the food service areas. Upopened bottled water may be carried only in a visitor‟s bag. Cell phones may not be used in the galleries. Animals, other than service animals, are not permitted in the Gallery. Skateboarding is prohibited. Picturetaking (including video) for personal use is permitted except in special exhibitions and where specifically prohibited. Tripods(三角架 ) are not allowed. Please do not touch the works of art. 62. When people e to visit the Gallery, they should _______. A. leave all their carried items at the checkrooms B. have all their carried items xrayed at the entrance C. take all their carried items with them without inspection D. have all their carried items inspected at the entrance 63. What does the Gallery feel sorry for? A. Visitors have to keep their valuable items in the checkrooms.. B. The size of visitor items allowed into the Gallery is limitted. C. It cannot keep oversized visitor items due to limited space.. D. Visitor items over 17*26 inches must go through additional checks. 64. Parents with small children visiting the Gallery __________. A. can carry their children in soft front child。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。