pcb设计的100条规则(编辑修改稿)内容摘要:
ust spend $3000. Are you smart enough to figure out how to use a $.30 op amp instead? 3 The Q of an LC tank circuit is dominated by the losses in the inductor in terms of series R. Q=3 Leakage current doubles for every 10degC increase in temp. 3 When inputs to most JFET op amps exceed the monmode range for the part, the output may reverse polarity. This artifact will haunt the designers of these parts for the rest of their lives, as it should! 3 Understand the difference between makebeforebreak and breakbeforemake when you specify switches. 3 3 Terminal voltage regulators in the TO220 packages are wonderful parts. They are cheap, rugged, thermally protected and very versatile. Use them virtually any place where you need a protected power transistor. They also make nice AM powermodulators. 3 Use step recovery diode where you need fast edges under 100pS (hotcarrier is even faster) 3 The old 723 regulator is still one of the lowest noise regulators around! ( 100Hz10k) 3 You can make a very simple oscillator with one diac, cap and a resistor. 3 NPN transistors are normally superior to their PNP counterpart in performance. Typical spec in some databooks should read Seen it once. Always work with the worst spec of the part when doing a design. 4 Dont just copy circuits from application notes without understanding pletely how it operates, and the reason for the choice of values. 4 Dealing with crystals, make sure you understand the difference between series and parallel resonant. In a circuit, crystal frequency can generally be slightly lowered by placing a inductor in series and increased by a capacitor in series. 4 Power MOSFETS onresistance will have a ve temp coef and not +ve at low current levels. This is important to remember when paralleling devices. 4 Lowest noise figure of a RF transistor is not normally where the input is perfectly matched. 4 Many unstable RF devices can be made stable by loading the input or the output by a simple resistor, either in series or parallel. 4 You trade gain for bandwidth. 4 Pushpull power invertors using bipolars are risky and can saturate the core because of hysteresis stepping (use power fets) 4 The Al value of a core will increase up to 50% or more under current transients. 4 Be aware of leaka。pcb设计的100条规则(编辑修改稿)
相关推荐
ed hole 2 非支撑孔: unsupported hole 2 导通孔: via 镀通孔: plated through hole (PTH) 3 余隙孔: access hole 3 盲孔: blind via (hole) 3 埋孔: buried via hole 3 埋 /盲孔: buried /blind via 3 任意层内部导通孔: any layer inner via
研究者证明 O(logN)甚至O(logN/loglogN)的平均路径长度也不能满足状态变化剧烈的网络应用 的需求。 新的搜索算法受到这种折衷关系制约的根本原因在于 DHT 对网络拓扑结构的确定性认识。 2. 语义查询和 DHT 的矛盾 现有 DHT 算法由于采用分布式散列函数,所以只适合于准确的查找,如果要支持目前Web 上搜索引擎具有的多关键字查找的功能,还要引入新的方法。 主要的原因在于
为 “ Microsoft Office Document Image Writer” ,确认后将该 PDF 文件输出为 MDI 格式的虚拟打印文件。 编辑提示:如果你在 “ 名称 ” 设置的下拉列表中没有找到 “ Microsoft Office Document Image Writer” 项,那证明你在安装 Office 2020的时候没有安装该组件,请使用 Office 2020
IndicateReceive等函数通知 NDIS。 4. 当上层协议驱动得到了一个完整的数据报文并且处理完毕以后,它会调用 NdisReturnPacket,然后 NDIS会调用我们的 MPReturnPacket. 5. 在我们的 MPReturnPacket中,释放我们自己分配的 MyPacket,然后同样的向下层调用 NdisReturnPacket。 下层会释放他们自己分配的
电源控制器 CRIO8 八路大电流电源控制器,配合主控机使用,用于控制灯光、电动屏幕、电动窗帘等外设供电电源。 控制器内设 8 个大电流继电器,最大电流值 10A,最大负载能力 2200W/路,总负载能力 8000W。 CRIO8 的控制线和控制主机的“网络接口”接口连接,如图所示: 1 2 3 4 5 6 7 8 91 2 3 4 5 6 7 8 GNETLOCAL INPUT24 Y Z
fset (圖 3),在第 30 格及第 60 格都增加一關鍵畫面。 圖 3 現在我們選擇播放, Stage (舞台 ) 視窗會隨著 Offset 所設定路徑移動,雖然我們沒有設定 Emitter 移動,但舞台移動所以好像 Emitter 也著 Offset 路徑移動。 Angle (舞台角度 ) 在 Stage 中加