microsoftword-机﫺械词汇doc213ij䓰ሀ(编辑修改稿)内容摘要:

洗 pickling 水洗 rinse 热水清洗 hot water rinse 电泳涂层 electophoretic coating 喷丸处理 shot blasting 磨光(抛光 0 burnishing 出光 glaring 罩光磷化预处理 phosphating pretreatment 薄膜磷化处理 thin amorphous phosphating 湿碰湿 wettowet 钝化 passivating 结皮现象 skinning 起皱 wrinkling 遮蔽 masking 凉干 flash off 气幕 air seal 喷漆室 booth 干式喷漆室 dry spray booth 水过滤式喷漆室 water wash spray booth 下吸式喷漆室 down draft spray booth 侧抽风喷漆室 spray booth of side exhaust 油漆调制室 paint mixing room 打磨间 scuff sand booth 通过式烘干室 passing through type baking oven 桥式烘干室 bridge type baking oven 辐射对流烘干室 joint radiation convection oven 浸漆设备 dip equipment 浸漆槽 dip tank 循环槽自动喷漆机 automatic sprayer 热喷漆机 flow coating equipment 淋漆设备 flow coating equipment 手工浸漆设备 hand dip equipment 无空气喷涂设备 airless spray equipment 电泳涂漆设备 electro apparatus 电涂漆设备 electrocoating installation 静电喷漆设备 electrostatic spray equipment 喷枪 spray gun 双头喷枪 double head spray gun 空气喷枪 air spray gun 吊具 sling 推杆悬链 doublechain conveyer 悬挂运输链 overhead conveyer 油水分离器 oilwater separator 油漆调制罐 paint mixing tank 除尘装置 dust collector 静电除尘装置 electrostatic dust collector 阴极罩 cathode shiedl 超滤装置 ultrafiltration device 喷砂机 sand blasting machine 红外线固化紫外线固化 UV curing 电子束固化 electron beam curing 辐射固化漆膜 radiation cured coating (RCC) 光泽计 glossmeter 比重计 gravimeter 粘度计 viscosimetr 细度计 fineness gauge 厚 度计 thickness gauge 遮盖力测定仪 cryptometer 电镀 electroplating 预镀(冲镀) striking 防镀(止镀) resist 无氰电镀 noncyanide plating 化学电镀 electroless plating 气相电镀 vapor plating 挂镀 rack 用假阴极电镀 dummying 机械电镀 mechanical plating 浸镀 immersion plating 退镀 stripping 滚镀 barrel plating 电解沉积混浊度 turbidity 侵蚀 fretting 侵渍作用 maceration 亲水的 hydrophilic 疏水的 hydrophobic 絮凝剂 flocculant 光亮镀层 bright coating 防腐镀层 coating for protection against corrosion 冲洗 flush 打光 lapping 抛光 burnishing 滚光 tumbling 变色 tarnishing 电解 electrolysis 沉淀法 decantation 抗暗处理 antitarnish treatment 均镀力 levelling power 深镀能力 covering power 酸洗 pickling 磷化 phosphating 镀锌 galvanizing 漂白出斑点 spotting out 电镀机 plating machine 自动电镀装置 automatic plating machine 直线式电镀机 straightline plating machine 挂式 电镀机 plating machine held on racks 钟形滚镀机 obliquebarrel plating machine 微型滚镀机 portable plating barrel 冷水槽 cold rinse bank 双联冷水槽 double countercurrent rinse tank 电解去油槽 electrolytic cleaner 衬铅槽 lead lined steel tank 哈林电槽 haring cell 热水槽 hot rise tank 超声波去油槽 ultrasonic cleaning tank 浸酸槽 acid dip tank 温水槽 warm rinse tank 赫尔槽 hull cell 镀锌槽 zincplating tank 固定槽 plating tank 回收槽 reclaim tank 水平全浸式滚筒 horizontally fullyimmersed barrel 六角滚筒孔板流量计 orifie meter 浊度计 nephelometer 库仑计 coulometer 滴重计 stalagmometer 汽车制造设备 manufactruing equipment of automobile 万能铣床 universal milling machine 内外圆研磨床 innerouter happing machine 仿形车床 copy lathe 龙门刨床 double housing planer 牛头刨床 shaper 攻丝机 threading machine 双柱坐标镗床 double pillar jig borer 滚丝机 thread roller 滚齿机 hobbing machine 钻床 drilling machine 插床 slotting machine 珩齿机 gear honing machine 平衡 钻中心孔机床 balancing centering machine 曲轴车床 crankshaft turning lathe 双工位曲轴车床 doublepost carnkshafttruning blathe 曲轴(主轴颈)车床 crankshaft (main journal turning lathe) 凸轮轴(轴颈)车床液压仿形车床 dydraulic coping lathe 凸轮轴仿形车床 camsahft coping lathe 多轴深孔钻床 multispindle deep hole drilling machine 曲轴轴颈铣削专用机床 crankshaft journal milling machine 数控曲轴铣床 N/C crankshaft milling machine 螺纹铣床 thread milling mahcine 球面蜗杆铣床 coneworm milling machine 花键轴铣床 spline shaft milling mahcine 转鼓铣床 drum milling machine 旋风式曲轴铣床 whirlwind type crankshaft milling machine 曲轴主轴颈磨床 cranksahft journal grinding machine 凸轮轴磨床 camshaft grinding machine 螺纹磨床 thread grinding machine 活塞销超精加工机 piston pin superfinishing machine 弹簧端面磨床 grinding machine for spiral spring 活塞椭圆磨床 piston oval grinding mahcine 多砂轮平面磨床 multiple abrasive wheels surface grinding machine 宽砂轮外圆磨床 wide abrasive wheel cylindrical grinding machine 蜗杆磨床 worm grinding machine 靠模磨床 copy grinding mahcine 花键磨床 spline shaft grinding machine 齿轮磨床活塞环内外圆无心磨床 internal and cylindrical centerless grinder for pistone ring 活塞环卧轴双端面磨床 horizontal spindle double ended grinding machine for piston ring 活塞环立轴双端面磨床 vertical spindle double ended grinding mahcine for piston ring 活塞环倒角磨床 piston ring chamfering grinding machine 金刚镗床 diamond fine boring machine 坐标镗床 jigboring machine 花键轴冷打机床 spline shaft coldstriking machine 气缸体侧拉床 cylinder block side broaching machine 气缸体专用拉床 cylinder block broaching machine 立式双溜板外拉床 vertical doubleapron external broaching machine 卧式连续式拉床 horizontal continuous broaching machine 活塞加工多工位组合机床 multiple station bined machine for piston machining 转鼓式双面钻镗组合机床 drum type double face drilling and boring bined machine 气缸盖加工自动线 automatic production line for cylinder head 气缸体加工自动线 automatic production line for cylinder block 曲轴动平衡自动线 automatic production line for cranshaft dynamic balance 连杆加工自动线 automatic production line for connecting rod 汽车主减速器壳加工自动线 automatic production line for automobile final drive housing 曲轴超精磨机床 crankshaft superfinishing machine 凸轮轴超精磨机床 camshaft polishing machine 曲轴轴颈抛光机床 crankshaft polishing machine 凸轮轴抛光机床直齿锥齿轮刨齿机 straight bevel gear ge。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。