mba英语复试自我介绍样本(编辑修改稿)内容摘要:

ieved the selfcontrol, can we make progress. I always list the things to be done down on a piece of paper and try to finish them one by one, but not confine them on the timetable. Faced with setback, I won’t be lost in despair, but positively take pains to size up the trouble, and then take action. I won’t let the negative factor affec。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。