fda三聚氰胺(melamine)检测标准(编辑修改稿)内容摘要:

eam of dry air using a ReactiVap module set at approximately 70176。 C. Add 200 181。 l pyridine and 200 181。 l BSTFA, vortex briefly to mix, and incubate at approximately 70176。 C for 30 minutes. Known Samples: In general, if working with a known concentration of analyte (. standards), appropriate dilutions should be made with pyridine/BSTFA to achieve an on column concentration no greater than 100 181。 g/mL. After calculating suitable dilutions, transfer an appropriate amount of the standard solution to an autosampler vial. Evaporate to dryness under a stream of dry air using a ReactiVap module set at approximately 70176。 C. Add 200 181。 l pyridine and 200 181。 l BSTFA, vortex briefly to mix, and incubate at approximately 70176。 C for 30 minutes. Unknown Samples: Transfer 40 181。 l of the methanol extract prepared for analysis in section A into an autosampler vial. Evaporate to dryness under a stream of dry air using a ReactiVap module set at approximately 70176。 C. Add 200 181。 l pyridine and 200 181。 l BSTFA, vortex briefly to mix, and incubate at approximately 70176。 C for 30 minutes. C. Sample Fortification: This method was successfully applied to detect melamine in wet and dry pet food posites (Figure 2) and dry wheat glutens (Figure 3). Based on HPLCUV results, this method was able to detect melamine levels down to % (by weight) in official FDA samples using ~ g samples with TMS derivatization and splitless injection. Uncontaminated wheat gluten and pet food posites were spiked w。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。