cisco配置案例∶多区域和nbmaospf(编辑修改稿)内容摘要:
0, Dead 120, Wait 120, Retransmit 5 oobresync timeout 120 Hello due in 00:00:25 Index 1/3, flood queue length 0 Next 0x0(0)/0x0(0) Last flood scan length is 1, maximum is 1 Last flood scan time is 4 msec, maximum is 4 msec Neighbor Count is 1, Adjacent neighbor count is 1 Adjacent with neighbor (Designated Router) Suppress hello for 0 neighbor(s) Serial1 is up, line protocol is up Inter Address , Area 1 Process ID 1, Router ID , Network Type POINT_TO_POINT, Cost: 64 Transmit Delay is 1 sec, State POINT_TO_POINT, Timer intervals configured, Hello 10, Dead 40, Wait 40, Retransmit 5 oobresync timeout 40 Hello due in 00:00:08 Index 2/2, flood queue length 0 Next 0x0(0)/0x0(0) Last flood scan length is 1, maximum is 1 Last flood scan time is 0 msec, maximum is 4 msec Neighbor Count is 1, Adjacent neighbor count is 1 Adjacent with neighbor Suppress hello for 0 neighbor(s) Ether0 is up, line protocol is up Inter Address , Area 1 Process ID 1, Router ID , Network Type BROADCAST, Cost: 10 Transmit Delay is 1 sec, State BDR, Priority 1 Designated Router (ID) , Interface address Backup Designated router (ID) , Interface address Timer intervals configured, Hello 10, Dead 40, Wait 40, Retransmit 5 o。cisco配置案例∶多区域和nbmaospf(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。