asynthesisoftropinone托品酮合成(编辑修改稿)内容摘要:
f the dipiperonylidene derivative serves as a means of detection of the merest traces of tropinone, and the test may be applied in the following manner. A solution which it is suspected contains the base may first be acidified and evaporated in a vacuum in order to remove possible volatile neutral impurities, such as acetone. Alcohol, an excess of piperonal, and potassium hydroxide are then added, and the solution heated on the steambath for two or three minutes and then poured into ether. The ethereal solution is washed with water and separated, and then agitated with a little dilute hydrochloric acid. If tropinone is present, the hydrochloride of the derivative is so obtained in a crystalline condition. Synthesis of Tropinone from succindialdehyde, methylamine, and acetone. In this reaction, which has not yet been sufficiently investigated, it seemed that the tropinone could only be detected after the expiration of a brief period from the time of addition of the methylamine. If the reaction mixture was allowed to remain overnight, other basic ketones were obtained which condensed with piperonal and interfered with the recognition of the desired product. Succindialdoxime (7g) suspended in water (30ml) was converted into succindialdehyde by means of nitrous fumes generated from nitric acid () and arsenious oxide according to the method developed by Harries (Ber., 1901,34,1494).Water (50ml) was then added, and the nitrous and nitric acids neutralized by means of an excess of precipitated calcium carbonate. After the addition of acetone (5g) , and then methylamine() dissolved in water (20ml) , the mixture was allowed to remain during half an hour. The solution was acidified with hydrochloric acid and tested for tropinone by the method described above. The small quantity of the crystalline hydreochloride was collected, treated with a little aqueous ammonia, and the base crystallized from ethyl acetate. The yellow needles melted at 214, and at the same temperature when mixed with a specimen of dipiperonylideropinone. The colour reactions of the two specimens in concentrated sulphuric acid were identical. Synthesis of Tropinone from Succindialdehyde, Methylamine, and Ethyl Acetonedicarboxylate Succindialdehyde (1g) and ethyl acetonedicarboxylate () were dissolved in alcohol (20ml) , and, after cooling in icewater , a solution of methylamine () in alcohol (10ml) was gradually added during an hour. After remaining overnight at the ordinary temperature, the alcohol was removed by distillation in a vacuum, and the residue boiled with dilute sulphuric a。asynthesisoftropinone托品酮合成(编辑修改稿)
相关推荐
allow1(i))=cint(ipstr(i)) then check(i)=true checkip=true exit for else if cint(ipstr(i))cint(allow2(i)) then check(i)=true checkip=true exit for else if cint(ipstr(i))cint(allow2(i)) then
址方式,实现: 源操作数 目的操作数 MOV A, @Ri MOV A, direct MOV A, data Rn MOV Rn, A MOV Rn, data MOV Rn, direct direct MOV direct, A MOV direct, data MOV direct, direct MOV direct, Rn MOV direct, @Ri @Ri MOV @Ri,
延时 2ms,并指向下一个偏移量 5 个数码管显示完否。 AT89S51单片机实验及实践教程 69 MOV DPTR,TABLE1 SJMP DIR DIR1: MOV DPTR,TABLE2 DIR: MOV R0,00H MOV R1,01H NEXT: MOV A,R0 MOVC A,@A+DPTR MOV P0,A MOV A,R1 MOV P2,A LCALL DAY INC R0
语言。 很简单:建立了数据库连接,也绑定了记录集,那具体需要哪些信息呢。 也 就是要筛选一些记录集合了,不过当前采用的是无任何条件,即可以提取所有。 4, sql,conn,1,1 真正地打开通向数据库中记录集的大门,具体有关后面的参数可以从如下网址中获得。 5, if and then 该语句里面涉及到了 和 以及两者的逻辑运算 and。 表示到达数据库表中的最后一行,
(三 )系统结构设计 根据系统功能和系统特点 ,将两个图结合可得出系统结构设计图。 六﹑数据库设计 数据库技术示信息资源管理最有效得手段。 数据库设计是指对于一个给定的应用环境构造最优的数据库模式 ,建立数据库及应用系统 ,有效存储数据 ,满足用户信息要求 和处理要求。 数据库结构设计的好坏将直接对应用系统的效率及实现的效果产生影响。 合理的数据库结构设计可以提高数据库存储的效率
Local)。 UID=***。 PWD=***。 amp。 _ database=数据库名。 0 SQL server OLE DB 连接方法 程序代码 set adocon=() provider=。 Data Source=RITANT4。 amp。 _ user ID=***。 Password=***。 amp。 _ inital Catalog=数据库名 0 Oracle 连接方法