91-94阅读题其余(编辑修改稿)内容摘要:

n that during an El Nino, two conditions exist: (1) unusually warm water extends along the eastern Pacific, principally along the (25) coasts of Ecuador and Peru, and (2) winds blow from the west into the warmer air rising over the warm water in the east. These winds tend to create a feedback mechanism by driving the warmer (30) surface water into a pile that blocks the normal upwelling of deeper, cold water in the east and further warms the eastern water, thus strengthening the wind still more. The contribution of (35) the model is to show that the winds of an El Nino, which raise sea level in the cast, simultaneously send a signal to the west lowering sea level. According to the model, that signal is generated (40) as a negative Rossby wave, a wave of depressed, or negative, sea level, that moves westward parallel to the equator at 25 to 85 kilometers per day. Taking months to traverse the Pacific, Rossby (45) waves march to the western boundary of the Pacific basin, which is modeled as a smooth wall but in reality consists of quite irregular island chains, such as, the Philippines and Indonesia. (50) When the waves meet the western boundary, they are reflected, and the model predicts that Rossby waves will be broken into numerous coastal Kelvin waves carrying the same negative (55) sealevel signal. These eventually shoot toward the equator, and then head eastward along the equator propelled by the rotation of the Earth at a speed of about 250 kilometers per day. When (60) enough Kelvin waves of sufficient amplitude arrive from the western Pacific, their negative sealevel signal overes the feedback mechanism tending to raise the sea level, and they begin (65) to drive the system into the opposite cold mode. This produces a gradual shift in winds, one that will eventually send positive sealevel Rossby waves westward, waves that will eventually (70) return as cold cycleending positive Kelvin waves, beginning another warming cycle. 21. The primary function of the passage as a whole is to (A) introduce a new explanation of a physical phenomenon (B) explain the difference between two related physical phenomena (C) illustrate the limitations of applying mathematics to plicated physical phenomena (D) indicate the direction that research into a particular physical phenomenon should take (E) clarify the differences between an old explanation of a physical phenomenon and a new model of it 22. Which of the following best describes the anization of the first paragraph? (A) A theory is presented and criticized. (B) A model is described and evaluated. (C) A result is reported and its importance explained. (D) A phenomenon is noted and its significance debated. (E) A hypothesis is introduced and contrary evidence GRE 国 内 题 90 – 94 COPYLEFT TONGLEI 5 presented. 23. According to the passage, which of the following features is characteristic of an El Nino? (A) Cold coastal water near Peru (B) Winds blowing from the west (C) Random occurrence (D) Worldwide effects (E) Short duration 24. According to the model presented in the passage, which of the following normally signals the disappearance of an El Nino? (A) The arrival in the eastern Pacific of negative sealevel Kelvin waves. (B) A shift in the direction of the winds produced by the start of an antiEl Nino elsewhere in the Pacific. (C) The reflection of Kelvin waves after they reach the eastern boundary of the Pacific, along Ecuador and Peru. (D) An increase in the speed at which negative Rossby waves cross the Pacific. (E) The creation of a reservoir of colder, deep ocean water trapped under the pile of warmer, surface ocean water. 25. It can be inferred from the passage that which of the following would result fairly immediately from the cessation of the winds of an El Nino? I. Negative Rossby waves would cease to be generated in the eastern Pacific. II. The sea level in the eastern Pacific would fall. III. The surface water in the eastern Pacific would again be cooled by being mixed with deep water. (A) I only (B) II only (C) I and II only (D) I and III only (E) I, II, and III 26. Which of the following, if true, would most seriously undermine the validity of the model of El Nino that is presented in the passage? (A) During some years El Nino extends significantly farther along the coasts of Ecuador and Peru than during other years. (B) During periods of unusually cool temperatures along the eastern Pacific, an El Nino is much colder than normal. (C) The normal upwelling of cold water in the eastern Pacific depends much more on the local characteristics of the ocean than on atmospheric conditions. (D) The variations in the time it takes Rossby waves to cross the Pacific depend on the power of the winds that the waves encounter. (E) The western boundary of the Pacific basin is so irregular that it impedes most coastal Kelvin waves from heading eastward. 27. The passage best supports the conclusion that during an antiEl Nino the fastestmoving signal waves are (A) negative Rossby waves moving east along the equator (B) positive Rossby waves moving west along the equator (C) negative Kelvin waves moving west along the equator (D) positive Kelvin waves moving west along the equator (E) positive Kelvin waves moving east along the equator Isadora Duncan39。 s masterly writings on the dance reveal the depth of her determination to create a lyric form of the art which was free of (5) characterization, storytelling, and the theatrical exhibition of skills. She wished to discard the traditional methods and establi。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。