non-currentassetsheldforsaleanddiscontinuedoperations(编辑修改稿)内容摘要:

ment loss should normally be charged to SCI – an entity shall recognise a gain for any subsequent increase in fair value less costs to sell of an asset, but not in excess of the cumulate impairment loss that has been recognised. • Presentation – separately on the face of the SFP, among current assets. F7 6 Test1, p264 Continued • Disclosures – description of the noncurrent asset or disposal group – description of facts and circumstances of the sale (disposal) and the expected timing – impairment losses and reversals, if any, and where in the statement of prehensive ine they are recognised – if applicable, the reportable segment in which the noncurrent asset (or disposal group) is presented in accordance with IFRS 8 Operating Segments F7 7 Discontinued Operation • A ponent of an enterprise that either has been disposed of, or is classified as held for sale – represents a separate major line of business or geographica。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。